If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565052506020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.866119,"lon":-114.61158,"icon":""}]} |
Location: 02/06-25-056-05W5/0 | |
Location Alias: 02/06-25-56-05 W5M | |
Location Alias 2: 02/06-25-056-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 05 | |
Section: 25 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: JOURNEY CHERHILL 6-25-56-5 | |
Operator Name: Journey Energy Inc. | |
License Number: 0104519 | |
License Date: 1983-12-05 | |
License Status: Suspension | |
Spud Date: 1984-01-30 | |
Final Drill Date: 1984-02-03 | |
Well Total Depth: 1347.00 m | |
Surface Hole Latitude: 53.866119 | |
Surface Hole Longitude: -114.611580 |
Date | Event |
---|---|
1983-12-05 | Obtained License |
1984-02-03 | Finished Drilling |
1984-02-03 | Well Log Performed |
1984-02-03 | Well Mode changed to Drilled and Cased |
1984-02-04 | Production Casing Operation Performed |
1984-03-04 | Well Log Performed |
1984-03-05 | Perforation Treatment Performed - Jet Perforation |
1984-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-09 | Perforation Treatment Performed - Jet Perforation |
1984-03-09 | Well Log Performed |
1984-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-24 | Well Began Production |
1984-03-24 | Well Fluid changed to Crude Oil |
1984-03-24 | Well Mode changed to Pumping |
1984-07-01 | Well Fluid changed to Crude Oil |
1984-07-01 | Well Mode changed to Suspended |
1987-04-26 | Well Fluid changed to Crude Oil |
1987-04-26 | Well Mode changed to Pumping |
1987-04-28 | Well Log Performed |
1987-05-07 | Perforation Treatment Performed - Jet Perforation |
1987-05-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-07-01 | Well Fluid changed to Crude Oil |
1990-07-01 | Well Mode changed to Suspended |
1997-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-09-05 | Perforation Treatment Performed - Jet Perforation |
1997-09-05 | Well Log Performed |
1997-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-09-08 | Perforation Treatment Performed - Jet Perforation |
1997-09-08 | Well Log Performed |
1997-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-09-17 | Well Fluid changed to Crude Oil |
1997-09-17 | Well Mode changed to Pumping |
1999-07-26 | Well Fluid changed to Crude Oil |
1999-07-26 | Well Mode changed to Suspended |
2012-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-09-10 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2012-09-10 | Plug Back Performed |
2012-09-10 | Well Fluid changed to Crude Oil |
2012-09-10 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-03-05 | Perforation | 1320.50 | 1322.50 | 13 |
1997-09-06 | Acid Treatment | 1299.50 | 1308.00 | 0 |
1997-09-08 | Perforation | 1295.00 | 1297.00 | 13 |
1997-09-09 | Acid Treatment | 1295.00 | 1297.00 | 0 |
2012-09-10 | Packing Dev Cpd w/Res-Gyp Cem | 1307.00 | 1310.00 | 0 |
2012-09-10 | Packing Device Capped w/Cement | 1285.00 | 1293.00 | 0 |
1984-03-07 | Acid Treatment | 1320.50 | 1322.50 | 0 |
1984-03-09 | Perforation | 1316.50 | 1319.00 | 13 |
1984-03-11 | Acid Treatment | 1316.50 | 1322.50 | 0 |
1987-05-07 | Perforation | 1311.50 | 1314.00 | 13 |
1987-05-13 | Acid Treatment | 1311.50 | 1322.50 | 0 |
1997-09-03 | Acid Treatment | 1311.50 | 1322.50 | 0 |
1997-09-05 | Perforation | 1299.50 | 1301.80 | 13 |
1997-09-05 | Perforation | 1306.00 | 1308.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1346 | 0.0 | 0.0 | 0.0 |
1987 | 2174 | 0.0 | 0.0 | 0.0 |
1997 | 2001 | 0.0 | 0.0 | 0.0 |
1998 | 8206 | 0.0 | 0.0 | 0.0 |
1999 | 888 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-09-11 | No Incident Encountered | 0.00 | 0.00 |
2012-09-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]