X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565052406000

Well Details

Well ID: 0565052406000
Loading map...
Location: 00/06-24-056-05W5/0
Location Alias: 00/06-24-56-05 W5M
Location Alias 2: 00/06-24-056-05 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 24
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 6-24-56-5
Operator Name: Journey Energy Inc.
License Number: 0102640
License Date: 1983-08-09
License Status: Suspension
Spud Date: 1983-09-02
Final Drill Date: 1983-09-09
Well Total Depth: 1360.00 m
Surface Hole Latitude: 53.851138
Surface Hole Longitude: -114.613514

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-09 Obtained License
1983-09-09 Finished Drilling
1983-09-10 Drill Stem Test Performed
1983-09-11 Production Casing Operation Performed
1983-09-24 Perforation Treatment Performed - Jet Perforation
1983-09-25 Perforation Treatment Performed - Cement Squeeze
1983-09-28 Perforation Treatment Performed - Jet Perforation
1983-09-29 Well Mode changed to Drilled and Cased
1983-11-04 Well Began Production
1983-11-04 Well Fluid changed to Crude Oil
1983-11-04 Well Mode changed to Pumping
1983-12-11 Well Fluid changed to Crude Oil
1983-12-11 Well Mode changed to Suspended
1987-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-05-05 Perforation Treatment Performed - Jet Perforation
1987-05-05 Well Log Performed
1989-02-25 Well Log Performed
1989-02-26 Perforation Treatment Performed - Cement Squeeze
1989-03-02 Well Log Performed
1989-03-03 Perforation Treatment Performed - Jet Perforation
1989-03-04 Well Fluid changed to Crude Oil
1989-03-04 Well Mode changed to Pumping
1989-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-22 Well Fluid changed to Crude Oil
1993-11-22 Well Mode changed to Suspended
1997-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-15 Plug Back Performed
1997-10-15 Well Fluid changed to Crude Oil
1997-10-15 Well Mode changed to Abandoned Zone
1997-10-16 Perforation Treatment Performed - Jet Perforation
1997-10-16 Well Log Performed
1997-10-18 Perforation Treatment Performed - Jet Perforation
1997-10-18 Well Log Performed
1999-05-21 Perforation Treatment Performed - Jet Perforation
1999-05-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-24 Perforation 1311.70 1313.70 13
1997-10-16 Perforation 1276.00 1277.00 13
1997-10-18 Perforation 1267.00 1269.00 13
1999-05-21 Perforation 573.50 575.00 14
1983-09-25 Cement Squeeze 1311.70 1313.70 0
1983-09-28 Perforation 1317.00 1318.50 13
1987-05-05 Packing Device Capped w/Cement 1308.00 1308.00 0
1987-05-05 Perforation 1299.00 1301.00 13
1989-02-26 Cement Squeeze 1299.00 1301.00 0
1989-03-03 Perforation 1304.00 1308.00 13
1989-03-08 Acid Treatment 1304.00 1308.00 0
1997-10-15 Packing Device Capped w/Cement 1285.00 1295.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 672 0.0 0.0 0.0
1989 6794 0.0 0.0 0.0
1990 5321 0.0 0.0 0.0

For data sources see[5]

References