X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565052301000

Well Details

Well ID: 0565052301000
Loading map...
Location: 00/01-23-056-05W5/0
Location Alias: 00/01-23-56-05 W5M
Location Alias 2: 00/01-23-056-05 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 23
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 1-23-56-5
Operator Name: Journey Energy Inc.
License Number: 0037488
License Date: 1969-12-24
License Status: Suspension
Spud Date: 1970-01-10
Final Drill Date: 1970-01-16
Well Total Depth: 1380.70 m
Surface Hole Latitude: 53.848267
Surface Hole Longitude: -114.625439

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-12-24 Obtained License
1970-01-16 Finished Drilling
1970-01-16 Well Mode changed to Drilled and Cased
1970-01-17 Production Casing Operation Performed
1970-01-21 Perforation Treatment Performed - Jet Perforation
1970-01-21 Well Began Production
1970-01-21 Well Fluid changed to Crude Oil
1970-01-21 Well Mode changed to Flowing
1970-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-01 Perforation Treatment Performed - Jet Perforation
1993-11-22 Well Fluid changed to Crude Oil
1993-11-22 Well Mode changed to Suspended
2003-09-22 Perforation Treatment Performed - Jet Perforation
2003-09-23 Well Fluid changed to Crude Oil
2003-09-23 Well Mode changed to Pumping
2005-02-11 Well Log Performed
2008-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-01 Well Log Performed
2008-11-04 Well Log Performed
2008-11-05 Perforation Treatment Performed - Jet Perforation
2008-12-08 Perforation Treatment Performed - Fractured
2009-07-15 Well Fluid changed to Crude Oil
2009-07-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-21 Perforation 1315.20 1315.50 3
1970-01-21 Perforation 1315.80 1316.10 3
1970-01-22 Acid Treatment 1315.20 1316.10 0
1982-07-01 Perforation 1327.10 1328.90 13
2003-09-22 Perforation 1305.80 1311.80 17
2008-11-01 Packing Device Capped w/Cement 1310.50 1314.50 0
2008-11-05 Perforation 1284.00 1288.90 17
2008-12-08 Fracture 1284.00 1288.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 6260 0.0 0.0 0.0
1971 6854 0.0 0.0 0.0
1972 7903 0.0 0.0 0.0
1973 8390 0.0 0.0 0.0
1974 6883 0.0 0.0 0.0
1975 7192 0.0 0.0 0.0
1976 1582 0.0 0.0 0.0
1977 1125 0.0 0.0 0.0
1978 475 0.0 0.0 0.0
1979 134 0.0 0.0 0.0
1982 476 0.0 0.0 0.0
1983 1384 0.0 0.0 0.0
1984 7319 0.0 0.0 0.0
1985 7909 0.0 0.0 0.0
1986 7675 0.0 0.0 0.0
1987 8399 0.0 0.0 0.0
1988 8509 0.0 0.0 0.0
1989 2900 0.0 0.0 0.0
1990 337 0.0 0.0 0.0
1991 336 0.0 0.0 0.0
2003 175 0.0 0.0 0.0
2004 2244 0.0 0.0 0.0
2005 6730 0.0 0.0 0.0
2006 6171 0.0 0.0 0.0
2007 5251 0.0 0.0 0.0

For data sources see[5]

References