X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565051414004

Well Details

Well ID: 0565051414004
Loading map...
Location: 00/14-14-056-05W5/4
Location Alias: 00/14-14-56-05 W5M
Location Alias 2: 00/14-14-056-05 W5/04
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 14
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 14-14-56-5
Operator Name: Journey Energy Inc.
License Number: 0033869
License Date: 1968-03-12
License Status: Issued
Spud Date: 1968-03-18
Final Drill Date: 1968-03-25
Well Total Depth: 1383.80 m
Surface Hole Latitude: 53.843474
Surface Hole Longitude: -114.638708

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-12 Obtained License
1968-03-25 Finished Drilling
1968-03-25 Well Mode changed to Drilled and Cased
1968-03-26 Drill Stem Test Performed
1968-03-27 Production Casing Operation Performed
1968-04-04 Perforation Treatment Performed - Jet Perforation
1968-04-05 Perforation Treatment Performed - Acid Wash - No Pressure
1979-06-01 Perforation Treatment Performed - Jet Perforation
1982-06-13 Perforation Treatment Performed - Jet Perforation
1982-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-28 Plug Back Performed
1999-12-28 Well Log Performed
1999-12-29 Perforation Treatment Performed - Jet Perforation
1999-12-29 Well Log Performed
2008-03-04 Well Log Performed
2008-03-05 Perforation Treatment Performed - Cement Squeeze
2008-03-05 Plug Back Performed
2008-03-07 Perforation Treatment Performed - Jet Perforation
2008-03-08 Perforation Treatment Performed - Jet Perforation
2008-03-08 Well Log Performed
2008-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-07 Well Began Production
2008-08-07 Well Fluid changed to Crude Oil
2008-08-07 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-04-04 Perforation 1333.20 1335.00 7
2008-03-05 Cement Squeeze 1144.80 1145.80 0
2008-03-07 Perforation 1327.10 1331.40 13
2008-03-07 Perforation 1332.60 1335.00 13
2008-03-08 Perforation 1328.20 1334.20 20
2008-03-09 Acid Treatment 1327.10 1335.00 0
1968-04-05 Acid Wash 1333.20 1335.00 0
1979-06-01 Perforation 1332.60 1335.00 13
1979-06-01 Perforation 1327.10 1331.40 13
1982-06-13 Perforation 1344.20 1347.20 13
1982-06-17 Acid Treatment 1344.20 1347.20 0
1982-06-18 Acid Treatment 1344.20 1347.20 0
1999-12-28 Packing Device Capped w/Cement 1312.00 1320.00 0
1999-12-29 Perforation 1144.80 1145.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3085 0.0 0.0 0.0
2009 8175 0.0 0.0 0.0
2010 8440 0.0 0.0 0.0
2011 8491 0.0 0.0 0.0
2012 8571 0.0 0.0 0.0
2013 8510 0.0 0.0 0.0
2014 7453 0.0 0.0 0.0
2015 8713 0.0 0.0 0.0
2016 8626 0.0 0.0 0.0
2017 7227 0.0 0.0 0.0
2018 8220 0.0 0.0 0.0
2019 8564 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[5]

References