X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565051315000

Well Details

Well ID: 0565051315000
Loading map...
Location: 00/15-13-056-05W5/0
Location Alias: 00/15-13-56-05 W5M
Location Alias 2: 00/15-13-056-05 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 13
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 15-13-56-5
Operator Name: Journey Energy Inc.
License Number: 0037504
License Date: 1969-12-30
License Status: Issued
Spud Date: 1969-12-31
Final Drill Date: 1970-01-05
Well Total Depth: 1376.20 m
Surface Hole Latitude: 53.843695
Surface Hole Longitude: -114.605078

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-12-30 Obtained License
1970-01-05 Finished Drilling
1970-01-05 Well Mode changed to Drilled and Cased
1970-01-07 Production Casing Operation Performed
1970-01-10 Perforation Treatment Performed - Jet Perforation
1970-01-10 Well Began Production
1970-01-10 Well Fluid changed to Crude Oil
1970-01-10 Well Mode changed to Flowing
1970-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-12-20 Perforation Treatment Performed - Cement Squeeze
1973-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-07 Perforation Treatment Performed - Cement Squeeze
1973-01-08 Perforation Treatment Performed - Jet Perforation
1973-01-09 Perforation Treatment Performed - Acid Wash - No Pressure
1973-01-12 Perforation Treatment Performed - Acid Wash - No Pressure
1973-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-16 Perforation Treatment Performed - Selective Jet Perforations
1973-01-18 Perforation Treatment Performed - Acid Wash - No Pressure
1973-01-20 Perforation Treatment Performed - Acid Wash - No Pressure
1973-02-02 Well Fluid changed to Crude Oil
1973-02-02 Well Mode changed to Pumping
1978-06-10 Perforation Treatment Performed - Jet Perforation
1978-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-08 Perforation Treatment Performed - Cement Squeeze
1980-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-09 Perforation Treatment Performed - Jet Perforation
1982-07-15 Perforation Treatment Performed - Cement Squeeze
1982-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-01-18 Perforation Treatment Performed - Cement Squeeze
2008-01-31 Perforation Treatment Performed - Jet Perforation
2008-01-31 Well Log Performed
2008-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-02-06 Well Log Performed
2008-07-01 Well Began Injection
2008-07-01 Well Fluid changed to Water
2008-07-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-10 Perforation 1323.70 1324.40 13
1973-01-16 Selective Jet Perforations 1318.60 1318.90 0
1973-01-16 Selective Jet Perforations 1319.20 1319.50 0
1973-01-18 Acid Wash 1318.60 1319.50 0
1973-01-20 Acid Wash 1318.60 1319.50 0
1978-06-10 Perforation 1328.90 1329.50 7
1978-06-14 Acid Treatment 1323.70 1329.50 0
1980-09-08 Cement Squeeze 1323.70 1329.50 0
1980-09-09 Perforation 1310.90 1314.30 7
1980-09-09 Perforation 1315.30 1317.00 7
1980-09-09 Perforation 1318.30 1320.10 7
1970-11-19 Acid Treatment 1323.70 1324.40 0
1980-09-09 Perforation 1322.80 1325.90 7
1980-09-09 Acid Treatment 1310.90 1325.90 0
1982-07-15 Cement Squeeze 1318.50 1325.90 0
1982-07-16 Acid Treatment 1310.90 1318.30 0
2008-01-18 Cement Squeeze 1310.90 1317.00 0
2008-01-31 Perforation 1352.50 1358.50 20
2008-01-31 Perforation 1343.50 1347.50 20
2008-02-05 Acid Treatment 1343.50 1358.50 0
1972-12-20 Cement Squeeze 1323.70 1324.40 0
1973-01-07 Acid Treatment 1323.70 1324.40 0
1973-01-07 Cement Squeeze 1323.70 1324.40 0
1973-01-08 Perforation 1323.70 1324.40 7
1973-01-09 Acid Wash 1323.70 1324.40 0
1973-01-12 Acid Wash 1323.70 1324.40 0
1973-01-13 Acid Treatment 1323.70 1324.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 6036 0.0 0.0 0.0
1971 2094 0.0 0.0 0.0
1972 2526 0.0 0.0 0.0
1973 7256 0.0 0.0 0.0
1974 4046 0.0 0.0 0.0
1975 6045 0.0 0.0 0.0
1976 7919 0.0 0.0 0.0
1977 8304 0.0 0.0 0.0
1978 7341 0.0 0.0 0.0
1979 7961 0.0 0.0 0.0
1980 6772 0.0 0.0 0.0
1981 6712 0.0 0.0 0.0
1982 3822 0.0 0.0 0.0
1983 6616 0.0 0.0 0.0
1984 6656 0.0 0.0 0.0
1985 7839 0.0 0.0 0.0
1986 7423 0.0 0.0 0.0
1987 8349 0.0 0.0 0.0
1988 8222 0.0 0.0 0.0
1989 8491 0.0 0.0 0.0
1990 8162 0.0 0.0 0.0
1991 7227 0.0 0.0 0.0
1992 7387 0.0 0.0 0.0
1993 912 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References