X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565041810002

Well Details

Well ID: 0565041810002
Loading map...
Location: 00/10-18-056-04W5/2
Location Alias: 00/10-18-56-04 W5M
Location Alias 2: 00/10-18-056-04 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 04
Section: 18
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 10-18-56-4
Operator Name: Journey Energy Inc.
License Number: 0082540
License Date: 1980-05-02
License Status: Suspension
Spud Date: 1980-07-13
Final Drill Date: 1980-07-19
Well Total Depth: 1378.00 m
Surface Hole Latitude: 53.841173
Surface Hole Longitude: -114.580925

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-02 Obtained License
1980-07-19 Finished Drilling
1980-07-19 Well Mode changed to Drilled and Cased
1980-07-21 Drill Stem Test Performed
1980-07-22 Production Casing Operation Performed
1980-08-13 Perforation Treatment Performed - Jet Perforation
1980-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-16 Perforation Treatment Performed - Cement Squeeze
1980-08-16 Perforation Treatment Performed - Jet Perforation
1980-08-17 Perforation Treatment Performed - Cement Squeeze
1980-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-19 Perforation Treatment Performed - Jet Perforation
1983-08-25 Well Log Performed
1983-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-26 Perforation Treatment Performed - Jet Perforation
1985-08-17 Well Log Performed
1985-08-18 Well Log Performed
1985-08-19 Perforation Treatment Performed - Jet Perforation
1985-10-18 Well Began Production
1985-10-18 Well Fluid changed to Gas
1985-10-18 Well Mode changed to Flowing
1986-10-01 Well Fluid changed to Gas
1986-10-01 Well Mode changed to Suspended
2008-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-10 Plug Back Performed
2008-02-10 Well Fluid changed to Gas
2008-02-10 Well Log Performed
2008-02-10 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-13 Perforation 1347.60 1349.40 12
1985-08-19 Perforation 1325.50 1327.50 13
2008-02-10 Packing Device Capped w/Cement 1325.00 1333.00 0
2008-02-10 Packing Device Capped w/Cement 1312.00 1320.00 0
1980-08-14 Acid Treatment 1347.60 1349.40 0
1980-08-16 Perforation 1354.70 1355.00 5
1980-08-16 Cement Squeeze 1354.70 1355.00 0
1980-08-17 Cement Squeeze 1354.70 1355.00 0
1980-08-19 Perforation 1347.60 1349.40 13
1980-08-19 Acid Treatment 1347.60 1349.40 0
1983-08-26 Perforation 1348.00 1352.00 13
1983-08-26 Acid Treatment 1347.60 1352.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1760 0.0 0.0 0.0
1986 4546 0.0 0.0 0.0

For data sources see[5]

References