X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565041802004

Well Details

Well ID: 0565041802004
Loading map...
Location: 00/02-18-056-04W5/4
Location Alias: 00/02-18-56-04 W5M
Location Alias 2: 00/02-18-056-04 W5/04
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 04
Section: 18
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 2-18-56-4
Operator Name: Journey Energy Inc.
License Number: 0076591
License Date: 1979-06-27
License Status: Suspension
Spud Date: 1979-07-01
Final Drill Date: 1979-07-06
Well Total Depth: 1399.00 m
Surface Hole Latitude: 53.834195
Surface Hole Longitude: -114.581483

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-27 Obtained License
1979-07-06 Finished Drilling
1979-07-06 Well Mode changed to Drilled and Cased
1979-07-07 Drill Stem Test Performed
1979-07-08 Drill Stem Test Performed
1979-07-09 Drill Stem Test Performed
1979-07-10 Production Casing Operation Performed
1979-07-28 Perforation Treatment Performed - Jet Perforation
1979-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-08 Perforation Treatment Performed - Jet Perforation
1982-12-09 Perforation Treatment Performed - Cement Squeeze
1990-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-20 Plug Back Performed
1990-02-20 Well Log Performed
1990-02-21 Perforation Treatment Performed - Jet Perforation
1990-02-21 Well Log Performed
1991-10-31 Well Log Performed
1991-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-01 Plug Back Performed
1991-11-01 Well Log Performed
1991-11-03 Perforation Treatment Performed - Jet Perforation
1994-04-30 Perforation Treatment Performed - Jet Perforation
1994-04-30 Well Log Performed
1994-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-30 Well Log Performed
2001-08-11 Perforation Treatment Performed - Cement Plug
2001-08-11 Plug Back Performed
2001-08-24 Perforation Treatment Performed - Jet Perforation
2001-09-01 Well Began Production
2001-09-01 Well Fluid changed to Gas
2001-09-01 Well Mode changed to Flowing
2001-10-01 Well Fluid changed to Gas
2001-10-01 Well Mode changed to Suspended
2012-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-11 Plug Back Performed
2012-09-11 Well Fluid changed to Gas
2012-09-11 Well Log Performed
2012-09-11 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-28 Perforation 1340.00 1350.00 6
1994-05-03 Acid Treatment 1299.00 1304.00 0
2001-08-11 Cement Plug 1295.00 1304.00 0
2001-08-24 Perforation 1110.50 1111.20 13
2012-09-11 Packing Device Capped w/Cement 1093.00 1101.00 0
1979-07-29 Acid Treatment 1340.00 1350.00 0
1982-12-08 Perforation 1354.00 1355.00 9
1982-12-09 Cement Squeeze 1354.00 1355.00 0
1990-02-20 Packing Device Capped w/Cement 1329.50 1337.50 0
1990-02-21 Perforation 1321.50 1324.50 13
1991-11-01 Packing Device Capped w/Cement 1307.00 1316.00 0
1991-11-03 Perforation 1299.00 1301.00 14
1994-04-30 Perforation 1300.00 1304.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 513 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References