X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564260806000

Well Details

Well ID: 0564260806000
Loading map...
Location: 00/06-08-056-26W4/0
Location Alias: 00/06-08-56-26 W4M
Location Alias 2: 00/06-08-056-26 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 26
Section: 08
County/Municipality: Sturgeon County
Well Name: ESSO ALEXANDER 6-8-56-26
Operator Name: Imperial Oil Resources Limited
License Number: 0059785
License Date: 1976-08-17
License Status: Abandoned
Spud Date: 1976-08-21
Final Drill Date: 1976-08-28
Well Total Depth: 1247.50 m
Surface Hole Latitude: 53.823231
Surface Hole Longitude: -113.836518

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-17 Obtained License
1976-08-28 Finished Drilling
1976-08-28 Well Mode changed to Drilled and Cased
1976-08-30 Kick Occurred
1976-09-01 Drill Stem Test Performed
1976-09-03 Drill Stem Test Performed
1976-09-04 Production Casing Operation Performed
1976-10-08 Perforation Treatment Performed - Jet Perforation
1976-10-20 Well Began Production
1976-10-20 Well Fluid changed to Crude Oil
1976-10-20 Well Mode changed to Pumping
1976-12-14 Perforation Treatment Performed - Jet Perforation
1979-07-10 Well Log Performed
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Suspended
1993-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-24 Plug Back Performed
1993-08-24 Well Fluid changed to Crude Oil
1993-08-24 Well Mode changed to Abandoned
1993-10-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-10-08 Perforation 1224.10 1225.30 13
1976-12-14 Perforation 1235.40 1237.50 7
1993-08-24 Packing Device Capped w/Cement 1210.00 1218.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1434 0.0 0.0 0.0
1977 7127 0.0 0.0 0.0
1978 7035 0.0 0.0 0.0
1979 5488 0.0 0.0 0.0
1980 5951 0.0 0.0 0.0
1981 2707 0.0 0.0 0.0
1982 2883 0.0 0.0 0.0
1983 3436 0.0 0.0 0.0
1984 8062 0.0 0.0 0.0
1985 8063 0.0 0.0 0.0
1986 2003 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-08-30 Kick 1247.50 1247.50

For data sources see[6]

References