X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564243002000

Well Details

Well ID: 0564243002000
Loading map...
Location: 00/02-30-056-24W4/0
Location Alias: 00/02-30-56-24 W4M
Location Alias 2: 00/02-30-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 30
County/Municipality: Sturgeon County
Well Name: RIFE ET AL PEAVEY 2-30-56-24
Operator Name: Rife Resources Ltd.
License Number: 0102293
License Date: 1983-07-20
License Status: RecCertified
Spud Date: 1983-07-28
Final Drill Date: 1983-08-03
Well Total Depth: 1300.00 m
Surface Hole Latitude: 53.862281
Surface Hole Longitude: -113.552572

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-20 Obtained License
1983-08-03 Finished Drilling
1983-08-05 Production Casing Operation Performed
1983-08-20 Perforation Treatment Performed - Jet Perforation
1983-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-24 Perforation Treatment Performed - Jet Perforation
1983-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-11 Perforation Treatment Performed - Cement Squeeze
1983-09-12 Perforation Treatment Performed - Jet Perforation
1983-09-14 Perforation Treatment Performed - Visqueeze
1983-09-20 Perforation Treatment Performed - Jet Perforation
1983-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-11 Well Mode changed to Drilled and Cased
1989-08-31 Well Log Performed
1989-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-01 Perforation Treatment Performed - Jet Perforation
1989-09-01 Perforation Treatment Performed - Remedial Casing
1989-09-01 Well Abandoned
1989-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-20 Perforation 1270.00 1275.00 13
1989-09-01 Perforation 390.00 391.00 13
1989-09-01 Remedial Casing Cementing 390.00 391.00 0
1989-09-01 Packing Device Capped w/Cement 380.00 388.00 0
1983-08-23 Packing Device Capped w/Cement 1147.00 1155.00 0
1983-08-24 Perforation 1065.00 1066.00 13
1983-09-11 Acid Treatment 1065.00 1066.00 0
1983-09-11 Cement Squeeze 1065.00 1066.00 0
1983-09-12 Perforation 1270.00 1275.00 13
1983-09-14 Visqueeze 1270.00 1275.00 0
1983-09-20 Perforation 1271.00 1273.00 13
1983-09-23 Packing Device Capped w/Cement 1152.00 1160.00 0

For data sources see[4]



References