X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564242807002

Well Details

Well ID: 0564242807002
Loading map...
Location: 00/07-28-056-24W4/2
Location Alias: 00/07-28-56-24 W4M
Location Alias 2: 00/07-28-056-24 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 28
County/Municipality: Sturgeon County
Well Name: BARR PEAVEY 7-28-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0061195
License Date: 1976-11-18
License Status: Suspension
Spud Date: 1976-11-20
Final Drill Date: 1976-11-24
Well Total Depth: 1088.10 m
Surface Hole Latitude: 53.866540
Surface Hole Longitude: -113.503126

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-18 Obtained License
1976-11-24 Drill Stem Test Performed
1976-11-24 Finished Drilling
1976-11-25 Production Casing Operation Performed
1983-08-25 Well Log Performed
1983-08-27 Well Log Performed
1983-08-28 Perforation Treatment Performed - Jet Perforation
1983-08-29 Well Log Performed
1983-08-31 Perforation Treatment Performed - Cement Squeeze
1983-08-31 Well Log Performed
1983-09-01 Perforation Treatment Performed - Jet Perforation
1983-09-08 Well Log Performed
1983-09-09 Perforation Treatment Performed - Cement Squeeze
1983-09-10 Well Log Performed
1983-09-11 Perforation Treatment Performed - Jet Perforation
1984-01-06 Well Log Performed
1984-01-07 Perforation Treatment Performed - Jet Perforation
1988-08-12 Perforation Treatment Performed - Jet Perforation
1988-08-12 Well Log Performed
1988-08-12 Well Mode changed to Drilled and Cased
1989-03-15 Well Mode changed to Drilled and Cased
1990-06-04 Well Began Production
1990-06-04 Well Fluid changed to Gas
1990-06-04 Well Mode changed to Flowing
1998-01-01 Well Fluid changed to Gas
1998-01-01 Well Mode changed to Suspended
2002-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-20 Perforation Treatment Performed - Jet Perforation
2002-06-20 Plug Back Performed
2002-06-20 Well Log Performed
2002-06-21 Perforation Treatment Performed - Jet Perforation
2002-06-21 Well Log Performed
2012-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-12 Plug Back Performed
2012-02-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-28 Perforation 1074.70 1076.60 10
2002-06-20 Perforation 1052.50 1053.40 17
2002-06-20 Packing Device Capped w/Cement 1035.00 1043.00 0
2002-06-21 Perforation 969.30 972.30 17
2012-02-12 Packing Device Capped w/Cement 955.00 963.00 0
1983-08-28 Perforation 1079.50 1080.00 13
1983-08-31 Cement Squeeze 1074.70 1080.00 0
1983-09-01 Perforation 1074.70 1076.60 13
1983-09-09 Cement Squeeze 1074.70 1076.60 0
1983-09-11 Perforation 1074.70 1076.00 13
1984-01-07 Perforation 1071.60 1072.90 10
1988-08-12 Perforation 1057.10 1060.10 13
2002-06-20 Perforation 1050.30 1051.60 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3536 0.0 0.0 0.0
1991 6307 0.0 0.0 0.0
1992 8773 0.0 0.0 0.0
1993 8515 0.0 0.0 0.0
1994 7951 0.0 0.0 0.0
1995 7791 0.0 0.0 0.0
1996 7532 0.0 0.0 0.0
1997 7567 0.0 0.0 0.0

For data sources see[5]

References