X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564242413000

Well Details

Well ID: 0564242413000
Loading map...
Location: 00/13-24-056-24W4/0
Location Alias: 00/13-24-56-24 W4M
Location Alias 2: 00/13-24-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 24
County/Municipality: Sturgeon County
Well Name: DORSET FBA 13-24-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0082066
License Date: 1980-04-09
License Status: Suspension
Spud Date: 1980-05-01
Final Drill Date: 1980-05-05
Well Total Depth: 1085.00 m
Surface Hole Latitude: 53.859795
Surface Hole Longitude: -113.443129

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-09 Obtained License
1980-05-05 Finished Drilling
1980-05-06 Production Casing Operation Performed
1980-05-21 Perforation Treatment Performed - Jet Perforation
1980-06-19 Perforation Treatment Performed - Cement Squeeze
1980-06-19 Perforation Treatment Performed - Jet Perforation
1980-06-21 Perforation Treatment Performed - Jet Perforation
1980-08-09 Perforation Treatment Performed - Jet Perforation
1980-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-18 Well Mode changed to Drilled and Cased
1984-03-01 Well Began Production
1984-03-01 Well Fluid changed to Gas
1984-03-01 Well Mode changed to Flowing
1986-08-10 Perforation Treatment Performed - Jet Perforation
1986-08-10 Well Log Performed
1986-08-12 Perforation Treatment Performed - Acid Wash - No Pressure
1986-09-01 Well Fluid changed to Crude Oil
1986-09-01 Well Mode changed to Pumping
1999-09-30 Well Fluid changed to Crude Oil
1999-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-21 Perforation 1061.50 1062.80 13
1986-08-12 Acid Wash 1048.00 1062.80 0
1980-06-19 Perforation 1056.80 1058.00 13
1980-06-19 Cement Squeeze 1056.80 1058.00 0
1980-06-21 Perforation 1061.50 1062.80 13
1980-08-09 Perforation 1060.00 1061.50 13
1980-10-22 Acid Treatment 1060.00 1062.80 0
1986-08-10 Perforation 1048.00 1050.00 13
1986-08-10 Perforation 1052.00 1056.00 13
1986-08-10 Perforation 1057.00 1060.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2478 0.0 0.0 0.0
1985 5075 0.0 0.0 0.0
1986 5716 0.0 0.0 0.0
1987 8571 0.0 0.0 0.0
1988 7016 0.0 0.0 0.0
1989 8511 0.0 0.0 0.0
1990 8424 0.0 0.0 0.0
1991 8494 0.0 0.0 0.0
1992 7659 0.0 0.0 0.0
1993 5348 0.0 0.0 0.0
1994 6725 0.0 0.0 0.0
1995 7958 0.0 0.0 0.0
1996 8567 0.0 0.0 0.0
1997 8741 0.0 0.0 0.0
1998 7859 0.0 0.0 0.0

For data sources see[5]

References