X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564241904020

Well Details

Well ID: 0564241904020
Loading map...
Location: 02/04-19-056-24W4/0
Location Alias: 02/04-19-56-24 W4M
Location Alias 2: 02/04-19-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 19
County/Municipality: Sturgeon County
Well Name: DAYLIGHT 102 PEAVEY 4-19-56-24
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0258101
License Date: 2001-07-31
License Status: Abandoned
Spud Date: 2001-08-21
Final Drill Date: 2001-08-27
Well Total Depth: 1075.00 m
Surface Hole Latitude: 53.849034
Surface Hole Longitude: -113.567566

For data sources see[1][2]

Well History

Date Event
2001-07-31 Obtained License
2001-08-23 Surface Casing Operation Performed
2001-08-27 Drill Stem Test Performed
2001-08-27 Finished Drilling
2001-08-27 Well Log Performed
2001-08-28 Production Casing Operation Performed
2001-08-28 Rig Released
2001-08-28 Well Log Performed
2001-08-28 Well Mode changed to Drilled and Cased
2001-09-26 Perforation Treatment Performed - Jet Perforation
2001-09-26 Well Log Performed
2001-10-04 Perforation Treatment Performed - Fractured
2001-10-10 Well Log Performed
2001-10-13 Perforation Treatment Performed - Jet Perforation
2001-10-13 Well Log Performed
2005-01-03 Perforation Treatment Performed - Jet Perforation
2005-01-03 Well Log Performed
2010-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-07 Plug Back Performed
2010-07-07 Well Mode changed to Abandoned Zone
2010-07-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-26 Perforation 1053.00 1056.50 17
2001-10-04 Fracture 1053.00 1056.50 0
2001-10-13 Perforation 1008.00 1010.00 17
2001-10-13 Perforation 1010.50 1011.50 17
2001-10-13 Perforation 1012.00 1017.00 17
2005-01-03 Perforation 1001.00 1004.00 17
2010-07-07 Packing Device Capped w/Cement 1042.00 1050.00 0
2010-07-07 Packing Device Capped w/Cement 984.00 992.00 0

For data sources see[4]



References