X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564241002023

Well Details

Well ID: 0564241002023
Loading map...
Location: 02/02-10-056-24W4/3
Location Alias: 02/02-10-56-24 W4M
Location Alias 2: 02/02-10-056-24 W4/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 10
County/Municipality: Sturgeon County
Well Name: DORSET EXCELSIOR 2-10B-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0006710
License Date: 1953-07-08
License Status: Suspension
Spud Date: 1953-07-15
Final Drill Date: 1953-07-27
Well Total Depth: 1073.80 m
Surface Hole Latitude: 53.819810
Surface Hole Longitude: -113.480613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-08 Obtained License
1953-07-23 Drill Stem Test Performed
1953-07-24 Drill Stem Test Performed
1953-07-24 Production Casing Operation Performed
1953-07-27 Finished Drilling
1953-07-27 Perforation Treatment Performed - Open-Hole Completion
1974-10-15 Perforation Treatment Performed - Jet Perforation
1974-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-08 Plug Back Performed
1991-11-08 Well Log Performed
1991-11-12 Perforation Treatment Performed - Jet Perforation
1991-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-13 Plug Back Performed
1991-11-14 Perforation Treatment Performed - Jet Perforation
1991-11-14 Well Log Performed
1992-01-11 Perforation Treatment Performed - Jet Perforation
1992-01-11 Perforation Treatment Performed - Remedial Casing
1992-01-18 Perforation Treatment Performed - Jet Perforation
1992-01-18 Well Mode changed to Drilled and Cased
1992-12-07 Well Began Production
1992-12-07 Well Fluid changed to Gas
1992-12-07 Well Mode changed to Flowing
2002-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-11 Perforation Treatment Performed - Jet Perforation
2002-11-11 Plug Back Performed
2002-11-11 Well Log Performed
2002-11-14 Well Log Performed
2009-09-30 Well Fluid changed to Gas
2009-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-27 Open Hole/Barefoot Completion 1072.90 1073.80 0
1991-11-14 Perforation 824.00 826.00 13
1992-01-11 Perforation 374.80 375.00 13
1992-01-11 Remedial Casing Cementing 374.80 375.00 0
1992-01-18 Perforation 347.00 349.00 17
1992-01-18 Perforation 350.50 353.00 17
2002-11-11 Packing Device Capped w/Cement 801.00 809.00 0
2002-11-11 Perforation 324.00 326.00 13
1974-10-15 Perforation 1053.40 1057.70 3
1974-10-15 Perforation 1058.90 1059.80 3
1974-10-15 Perforation 1060.70 1062.50 3
1974-10-16 Acid Treatment 1053.40 1062.50 0
1991-11-08 Packing Device Capped w/Cement 1032.00 1040.00 0
1991-11-12 Perforation 878.70 880.70 13
1991-11-12 Perforation 984.50 987.50 13
1991-11-13 Packing Device Capped w/Cement 864.00 872.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 147 0.0 0.0 0.0
1993 7886 0.0 0.0 0.0
1994 8603 0.0 0.0 0.0
1995 8215 0.0 0.0 0.0
1996 7925 0.0 0.0 0.0
1997 8329 0.0 0.0 0.0
1998 7895 0.0 0.0 0.0
1999 8512 0.0 0.0 0.0
2000 8567 0.0 0.0 0.0
2001 8547 0.0 0.0 0.0
2002 8584 0.0 0.0 0.0
2003 8490 0.0 0.0 0.0
2004 8755 0.0 0.0 0.0
2005 8571 0.0 0.0 0.0
2006 8249 0.0 0.0 0.0
2007 4856 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References