If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564232901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.863733,"lon":-113.375432,"icon":""}]} |
Location: 00/01-29-056-23W4/0 | |
Location Alias: 00/01-29-56-23 W4M | |
Location Alias 2: 00/01-29-056-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 23 | |
Section: 29 | |
County/Municipality: Sturgeon County | |
Well Name: IMPERIAL BON ACCORD NO. 1 | |
Operator Name: Harry Bass Drilling Company | |
License Number: B0002583 | |
License Date: 1949-01-11 | |
License Status: RecCertified | |
Spud Date: 1949-01-12 | |
Final Drill Date: 1949-03-18 | |
Well Total Depth: 1411.20 m | |
Surface Hole Latitude: 53.863733 | |
Surface Hole Longitude: -113.375432 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-01-11 | Obtained License |
1949-01-28 | Drill Stem Test Performed |
1949-02-01 | Drill Stem Test Performed |
1949-02-06 | Drill Stem Test Performed |
1949-02-08 | Drill Stem Test Performed |
1949-02-12 | Drill Stem Test Performed |
1949-02-16 | Drill Stem Test Performed |
1949-02-18 | Drill Stem Test Performed |
1949-02-19 | Drill Stem Test Performed |
1949-02-20 | Drill Stem Test Performed |
1949-03-01 | Drill Stem Test Performed |
1949-03-03 | Drill Stem Test Performed |
1949-03-11 | Drill Stem Test Performed |
1949-03-15 | Drill Stem Test Performed |
1949-03-16 | Drill Stem Test Performed |
1949-03-18 | Finished Drilling |
1949-03-18 | Well Mode changed to Drilled and Cased |
1949-03-21 | Production Casing Operation Performed |
1949-03-23 | Perforation Treatment Performed - Bullet Perforation |
1949-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-04-04 | Perforation Treatment Performed - Bullet Perforation |
1949-04-04 | Perforation Treatment Performed - Cement Squeeze |
1949-04-11 | Perforation Treatment Performed - Bullet Perforation |
1949-04-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-04-18 | Well Began Production |
1949-04-18 | Well Fluid changed to Crude Oil |
1949-04-18 | Well Mode changed to Flowing |
1949-06-09 | Perforation Treatment Performed - Bullet Perforation |
1949-06-10 | Perforation Treatment Performed - Cement Squeeze |
1949-06-11 | Perforation Treatment Performed - Bullet Perforation |
1949-06-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-06-16 | Perforation Treatment Performed - Cement Squeeze |
1949-06-19 | Perforation Treatment Performed - Jet Perforation |
1949-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-06-25 | Perforation Treatment Performed - Bullet Perforation |
1949-06-25 | Perforation Treatment Performed - Cement Squeeze |
1949-06-26 | Perforation Treatment Performed - Bullet Perforation |
1949-06-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-06-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-08-01 | Well Fluid changed to Crude Oil |
1949-08-01 | Well Mode changed to Pumping |
1960-04-20 | Well Fluid changed to Crude Oil |
1960-04-20 | Well Mode changed to Suspended |
1964-09-15 | Perforation Treatment Performed - Cement Plug |
1964-09-18 | Well Fluid changed to Crude Oil |
1964-09-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-03-23 | Bullet Perforation | 1091.80 | 1094.80 | 13 |
1949-06-11 | Bullet Perforation | 1091.80 | 1093.00 | 10 |
1949-06-12 | Acid Treatment | 1091.80 | 1093.00 | 0 |
1949-06-16 | Cement Squeeze | 1083.30 | 1093.00 | 0 |
1949-06-19 | Perforation | 1091.80 | 1093.00 | 20 |
1949-06-25 | Cement Squeeze | 1091.80 | 1097.00 | 0 |
1949-06-25 | Bullet Perforation | 1091.80 | 1093.00 | 20 |
1949-06-25 | Acid Treatment | 1091.80 | 1093.00 | 0 |
1949-06-26 | Bullet Perforation | 1091.80 | 1093.00 | 26 |
1949-06-27 | Acid Wash | 1091.80 | 1093.00 | 0 |
1949-06-30 | Acid Wash | 1091.80 | 1093.00 | 0 |
1949-03-25 | Acid Treatment | 1091.80 | 1094.80 | 0 |
1964-09-15 | Cement Plug | 1071.40 | 1093.60 | 0 |
1949-04-04 | Bullet Perforation | 1085.10 | 1085.40 | 13 |
1949-04-04 | Cement Squeeze | 1085.10 | 1085.40 | 0 |
1949-04-04 | Bullet Perforation | 1091.80 | 1093.60 | 13 |
1949-04-11 | Bullet Perforation | 1091.80 | 1093.30 | 7 |
1949-04-17 | Acid Treatment | 1091.80 | 1093.60 | 0 |
1949-06-09 | Bullet Perforation | 1095.50 | 1095.80 | 7 |
1949-06-10 | Cement Squeeze | 1092.40 | 1095.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]