X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564232901000

Well Details

Well ID: 0564232901000
Loading map...
Location: 00/01-29-056-23W4/0
Location Alias: 00/01-29-56-23 W4M
Location Alias 2: 00/01-29-056-23 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 23
Section: 29
County/Municipality: Sturgeon County
Well Name: IMPERIAL BON ACCORD NO. 1
Operator Name: Harry Bass Drilling Company
License Number: B0002583
License Date: 1949-01-11
License Status: RecCertified
Spud Date: 1949-01-12
Final Drill Date: 1949-03-18
Well Total Depth: 1411.20 m
Surface Hole Latitude: 53.863733
Surface Hole Longitude: -113.375432

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-01-11 Obtained License
1949-01-28 Drill Stem Test Performed
1949-02-01 Drill Stem Test Performed
1949-02-06 Drill Stem Test Performed
1949-02-08 Drill Stem Test Performed
1949-02-12 Drill Stem Test Performed
1949-02-16 Drill Stem Test Performed
1949-02-18 Drill Stem Test Performed
1949-02-19 Drill Stem Test Performed
1949-02-20 Drill Stem Test Performed
1949-03-01 Drill Stem Test Performed
1949-03-03 Drill Stem Test Performed
1949-03-11 Drill Stem Test Performed
1949-03-15 Drill Stem Test Performed
1949-03-16 Drill Stem Test Performed
1949-03-18 Finished Drilling
1949-03-18 Well Mode changed to Drilled and Cased
1949-03-21 Production Casing Operation Performed
1949-03-23 Perforation Treatment Performed - Bullet Perforation
1949-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-04-04 Perforation Treatment Performed - Bullet Perforation
1949-04-04 Perforation Treatment Performed - Cement Squeeze
1949-04-11 Perforation Treatment Performed - Bullet Perforation
1949-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-04-18 Well Began Production
1949-04-18 Well Fluid changed to Crude Oil
1949-04-18 Well Mode changed to Flowing
1949-06-09 Perforation Treatment Performed - Bullet Perforation
1949-06-10 Perforation Treatment Performed - Cement Squeeze
1949-06-11 Perforation Treatment Performed - Bullet Perforation
1949-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-06-16 Perforation Treatment Performed - Cement Squeeze
1949-06-19 Perforation Treatment Performed - Jet Perforation
1949-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-06-25 Perforation Treatment Performed - Bullet Perforation
1949-06-25 Perforation Treatment Performed - Cement Squeeze
1949-06-26 Perforation Treatment Performed - Bullet Perforation
1949-06-27 Perforation Treatment Performed - Acid Wash - No Pressure
1949-06-30 Perforation Treatment Performed - Acid Wash - No Pressure
1949-08-01 Well Fluid changed to Crude Oil
1949-08-01 Well Mode changed to Pumping
1960-04-20 Well Fluid changed to Crude Oil
1960-04-20 Well Mode changed to Suspended
1964-09-15 Perforation Treatment Performed - Cement Plug
1964-09-18 Well Fluid changed to Crude Oil
1964-09-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-03-23 Bullet Perforation 1091.80 1094.80 13
1949-06-11 Bullet Perforation 1091.80 1093.00 10
1949-06-12 Acid Treatment 1091.80 1093.00 0
1949-06-16 Cement Squeeze 1083.30 1093.00 0
1949-06-19 Perforation 1091.80 1093.00 20
1949-06-25 Cement Squeeze 1091.80 1097.00 0
1949-06-25 Bullet Perforation 1091.80 1093.00 20
1949-06-25 Acid Treatment 1091.80 1093.00 0
1949-06-26 Bullet Perforation 1091.80 1093.00 26
1949-06-27 Acid Wash 1091.80 1093.00 0
1949-06-30 Acid Wash 1091.80 1093.00 0
1949-03-25 Acid Treatment 1091.80 1094.80 0
1964-09-15 Cement Plug 1071.40 1093.60 0
1949-04-04 Bullet Perforation 1085.10 1085.40 13
1949-04-04 Cement Squeeze 1085.10 1085.40 0
1949-04-04 Bullet Perforation 1091.80 1093.60 13
1949-04-11 Bullet Perforation 1091.80 1093.30 7
1949-04-17 Acid Treatment 1091.80 1093.60 0
1949-06-09 Bullet Perforation 1095.50 1095.80 7
1949-06-10 Cement Squeeze 1092.40 1095.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References