If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564231210020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.825902,"lon":-113.283877,"icon":""}]} |
Location: 02/10-12-056-23W4/0 | |
Location Alias: 02/10-12-56-23 W4M | |
Location Alias 2: 02/10-12-056-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 23 | |
Section: 12 | |
County/Municipality: Sturgeon County | |
Well Name: DAYLIGHT 102 REDWATER 10-12-56-23 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0278579 | |
License Date: 2002-12-16 | |
License Status: Suspension | |
Spud Date: 2002-12-27 | |
Final Drill Date: 2002-12-29 | |
Well Total Depth: 779.00 m | |
Surface Hole Latitude: 53.825902 | |
Surface Hole Longitude: -113.283877 |
Date | Event |
---|---|
2002-12-16 | Obtained License |
2002-12-27 | Surface Casing Operation Performed |
2002-12-29 | Finished Drilling |
2002-12-29 | Production Casing Operation Performed |
2002-12-29 | Well Log Performed |
2002-12-30 | Rig Released |
2002-12-30 | Well Mode changed to Drilled and Cased |
2003-01-08 | Perforation Treatment Performed - Jet Perforation |
2003-01-09 | Perforation Treatment Performed - Jet Perforation |
2003-11-17 | Well Began Production |
2003-11-17 | Well Fluid changed to Gas |
2003-11-17 | Well Mode changed to Flowing |
2012-07-01 | Well Fluid changed to Gas |
2012-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-01-08 | Perforation | 748.50 | 750.00 | 14 |
2003-01-09 | Perforation | 729.50 | 733.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1074 | 0.0 | 0.0 | 0.0 |
2004 | 7592 | 0.0 | 0.0 | 0.0 |
2005 | 6556 | 0.0 | 0.0 | 0.0 |
2006 | 8130 | 0.0 | 0.0 | 0.0 |
2007 | 2987 | 0.0 | 0.0 | 0.0 |
2008 | 2572 | 0.0 | 0.0 | 0.0 |
2009 | 2030 | 0.0 | 0.0 | 0.0 |
2010 | 3729 | 0.0 | 0.0 | 0.0 |
2011 | 4915 | 0.0 | 0.0 | 0.0 |
For data sources see[5]