X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564213514002

Well Details

Well ID: 0564213514002
Loading map...
Location: 00/14-35-056-21W4/2
Location Alias: 00/14-35-56-21 W4M
Location Alias 2: 00/14-35-056-21 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 35
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 14-35-56-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001983
License Date: 1950-09-08
License Status: Issued
Spud Date: 1950-09-09
Final Drill Date: 1950-09-19
Well Total Depth: 983.30 m
Surface Hole Latitude: 53.888904
Surface Hole Longitude: -113.015981

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-08 Obtained License
1950-09-15 Production Casing Operation Performed
1950-09-19 Finished Drilling
1950-09-19 Perforation Treatment Performed - Open-Hole Completion
1950-09-19 Well Mode changed to Drilled and Cased
1950-09-20 Perforation Treatment Performed - Acid Wash - No Pressure
1973-03-06 Perforation Treatment Performed - Cement Plug
1973-03-06 Perforation Treatment Performed - Open-Hole Completion
1985-12-11 Perforation Treatment Performed - Cement Plug
1985-12-11 Perforation Treatment Performed - Open-Hole Completion
1986-04-10 Perforation Treatment Performed - Jet Perforation
1986-04-12 Perforation Treatment Performed - Cement Plug
1986-04-12 Perforation Treatment Performed - Open-Hole Completion
1986-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-05 Well Log Performed
2001-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-09 Plug Back Performed
2001-10-11 Perforation Treatment Performed - Jet Perforation
2001-10-11 Well Log Performed
2001-10-29 Perforation Treatment Performed - Fractured
2001-11-07 Well Began Production
2001-11-07 Well Fluid changed to Crude Oil
2001-11-07 Well Mode changed to Pumping
2013-06-20 Well Fluid changed to Crude Oil
2013-06-20 Well Mode changed to Suspended
2013-12-05 Well Fluid changed to Crude Oil
2013-12-05 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-19 Open Hole/Barefoot Completion 948.80 983.30 0
1986-04-13 Acid Treatment 948.80 957.00 0
2001-10-09 Packing Device Capped w/Cement 936.00 944.00 0
2001-10-11 Perforation 640.00 645.00 17
2001-10-29 Fracture 640.00 645.00 0
1950-09-20 Acid Wash 948.80 983.30 0
1973-03-06 Cement Plug 972.30 983.30 0
1973-03-06 Open Hole/Barefoot Completion 948.80 972.30 0
1985-12-11 Cement Plug 960.80 983.30 0
1985-12-11 Open Hole/Barefoot Completion 948.80 960.80 0
1986-04-10 Perforation 954.50 957.50 13
1986-04-12 Cement Plug 957.00 960.80 0
1986-04-12 Open Hole/Barefoot Completion 948.80 957.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 929 0.0 0.0 0.0
2002 8203 0.0 0.0 0.0
2003 8575 0.0 0.0 0.0
2004 8451 0.0 0.0 0.0
2005 8072 0.0 0.0 0.0
2006 8682 0.0 0.0 0.0
2007 6919 0.0 0.0 0.0
2008 5112 0.0 0.0 0.0
2009 8745 0.0 0.0 0.0
2010 7193 0.0 0.0 0.0
2011 7907 0.0 0.0 0.0
2012 3215 0.0 0.0 0.0
2013 384 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8473 0.0 0.0 0.0
2016 8175 0.0 0.0 0.0
2017 8308 0.0 0.0 0.0
2018 7941 0.0 0.0 0.0
2019 2447 0.0 0.0 0.0

For data sources see[5]

References