X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564212708000

Well Details

Well ID: 0564212708000
Loading map...
Location: 00/08-27-056-21W4/0
Location Alias: 00/08-27-56-21 W4M
Location Alias 2: 00/08-27-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 27
County/Municipality: Strathcona County
Well Name: LONG RUN REDWATER 8-27-56-21
Operator Name: Long Run Exploration Ltd.
License Number: 0001312
License Date: 1950-03-29
License Status: Suspension
Spud Date: 1950-04-07
Final Drill Date: 1950-04-21
Well Total Depth: 991.80 m
Surface Hole Latitude: 53.867220
Surface Hole Longitude: -113.028428

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-03-29 Obtained License
1950-04-16 Production Casing Operation Performed
1950-04-21 Drill Stem Test Performed
1950-04-21 Finished Drilling
1950-04-21 Perforation Treatment Performed - Open-Hole Completion
1950-04-21 Well Mode changed to Drilled and Cased
1950-04-22 Perforation Treatment Performed - Acid Wash - No Pressure
1950-04-23 Well Began Production
1950-04-23 Well Fluid changed to Crude Oil
1950-04-23 Well Mode changed to Flowing
1951-03-24 Well Fluid changed to Crude Oil
1951-03-24 Well Mode changed to Pumping
1993-02-04 Well Fluid changed to Crude Oil
1993-02-04 Well Mode changed to Suspended
2002-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-29 Plug Back Performed
2002-10-29 Well Fluid changed to Crude Oil
2002-10-29 Well Log Performed
2002-10-29 Well Mode changed to Abandoned Zone
2002-11-20 Perforation Treatment Performed - Jet Perforation
2002-11-20 Well Log Performed
2002-11-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-04-21 Open Hole/Barefoot Completion 966.80 991.80 0
1950-04-22 Acid Wash 966.80 991.80 0
2002-10-29 Packing Device Capped w/Cement 946.00 954.00 0
2002-11-20 Perforation 653.20 659.20 20
2002-11-21 Fracture 653.20 659.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6222 0.0 0.0 0.0
1968 6113 0.0 0.0 0.0
1969 7755 0.0 0.0 0.0
1970 5387 0.0 0.0 0.0
1971 5180 0.0 0.0 0.0
1972 6257 0.0 0.0 0.0
1973 7379 0.0 0.0 0.0
1974 7433 0.0 0.0 0.0
1975 7091 0.0 0.0 0.0
1976 6360 0.0 0.0 0.0
1977 6040 0.0 0.0 0.0
1978 6043 0.0 0.0 0.0
1979 7603 0.0 0.0 0.0
1980 7398 0.0 0.0 0.0
1981 8016 0.0 0.0 0.0
1982 8497 0.0 0.0 0.0
1983 8361 0.0 0.0 0.0
1984 8181 0.0 0.0 0.0
1985 8689 0.0 0.0 0.0
1986 8621 0.0 0.0 0.0
1987 8668 0.0 0.0 0.0
1988 8432 0.0 0.0 0.0
1989 8569 0.0 0.0 0.0
1990 8436 0.0 0.0 0.0
1991 8702 0.0 0.0 0.0
1992 8458 0.0 0.0 0.0
1993 804 0.0 0.0 0.0

For data sources see[5]

References