X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564212705000

Well Details

Well ID: 0564212705000
Loading map...
Location: 00/05-27-056-21W4/0
Location Alias: 00/05-27-56-21 W4M
Location Alias 2: 00/05-27-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 27
County/Municipality: Strathcona County
Well Name: WESTFIRE REDWATER 5-27-56-21
Operator Name: Long Run Exploration Ltd.
License Number: 0018046
License Date: 1959-11-03
License Status: Suspension
Spud Date: 1959-11-05
Final Drill Date: 1959-11-14
Well Total Depth: 979.30 m
Surface Hole Latitude: 53.867656
Surface Hole Longitude: -113.046829

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-03 Obtained License
1959-11-14 Finished Drilling
1959-11-14 Well Mode changed to Drilled and Cased
1959-11-15 Drill Stem Test Performed
1959-11-16 Drill Stem Test Performed
1959-11-17 Production Casing Operation Performed
1959-11-20 Perforation Treatment Performed - Bullet Perforation
1959-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-05 Well Began Production
1959-12-05 Well Fluid changed to Crude Oil
1959-12-05 Well Mode changed to Pumping
1960-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1960-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1960-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-23 Perforation Treatment Performed - Bullet Perforation
1960-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-01 Well Fluid changed to Crude Oil
1973-05-01 Well Mode changed to Suspended
1980-06-20 Well Fluid changed to Crude Oil
1980-06-20 Well Mode changed to Pumping
1984-02-16 Perforation Treatment Performed - Jet Perforation
1984-02-21 Perforation Treatment Performed - Open-Hole Completion
1984-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-01 Well Fluid changed to Crude Oil
1984-10-01 Well Mode changed to Suspended
2003-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-22 Plug Back Performed
2003-06-22 Well Fluid changed to Crude Oil
2003-06-22 Well Mode changed to Abandoned Zone
2003-06-23 Perforation Treatment Performed - Jet Perforation
2003-06-26 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-11-20 Bullet Perforation 969.90 972.60 13
1960-09-12 Hydra Jet Perforation 973.80 974.10 0
1960-09-19 Acid Treatment 973.20 974.10 0
1960-09-23 Bullet Perforation 973.20 974.40 13
1960-09-23 Acid Treatment 973.20 974.40 0
1960-09-26 Acid Treatment 965.00 974.40 0
1964-03-08 Acid Treatment 965.00 974.40 0
1964-03-24 Acid Treatment 965.00 974.40 0
1984-02-16 Perforation 964.00 975.00 13
1984-02-21 Open Hole/Barefoot Completion 975.10 979.30 0
1984-02-23 Acid Treatment 964.00 979.30 0
1959-11-20 Bullet Perforation 965.00 967.40 13
2003-06-22 Packing Device Capped w/Cement 952.00 960.00 0
2003-06-23 Perforation 636.70 642.70 20
2003-06-26 Fracture 636.70 642.70 0
1959-11-22 Acid Treatment 965.00 972.60 0
1959-11-23 Acid Treatment 965.00 972.60 0
1960-03-01 Acid Treatment 965.00 972.60 0
1960-05-11 Hydra Jet Perforation 967.40 972.00 0
1960-05-11 Hydra Jet Perforation 972.20 973.20 0
1960-05-11 Acid Treatment 967.40 973.20 0
1960-09-12 Hydra Jet Perforation 973.20 973.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 912 0.0 0.0 0.0
1968 1095 0.0 0.0 0.0
1969 1188 0.0 0.0 0.0
1970 1068 0.0 0.0 0.0
1971 779 0.0 0.0 0.0
1972 276 0.0 0.0 0.0
1973 48 0.0 0.0 0.0
1984 2812 0.0 0.0 0.0

For data sources see[5]

References