X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564212305002

Well Details

Well ID: 0564212305002
Loading map...
Location: 00/05-23-056-21W4/2
Location Alias: 00/05-23-56-21 W4M
Location Alias 2: 00/05-23-056-21 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 23
County/Municipality: Strathcona County
Well Name: ACCEL HOLDINGS REDWATER 5-23-56-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001925
License Date: 1950-08-24
License Status: Issued
Spud Date: 1950-10-06
Final Drill Date: 1950-10-14
Well Total Depth: 986.30 m
Surface Hole Latitude: 53.852562
Surface Hole Longitude: -113.021998

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-24 Obtained License
1950-10-11 Production Casing Operation Performed
1950-10-14 Finished Drilling
1950-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-10-14 Perforation Treatment Performed - Open-Hole Completion
1950-10-14 Well Mode changed to Drilled and Cased
1980-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-03 Well Log Performed
1989-02-14 Perforation Treatment Performed - Cement Plug
1989-02-14 Perforation Treatment Performed - Open-Hole Completion
1989-02-14 Well Log Performed
1997-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-03 Plug Back Performed
1997-11-04 Perforation Treatment Performed - Jet Perforation
1997-11-19 Perforation Treatment Performed - Fractured
1997-12-01 Well Began Production
1997-12-01 Well Fluid changed to Crude Oil
1997-12-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-14 Open Hole/Barefoot Completion 960.70 986.30 0
1950-10-14 Acid Treatment 960.70 986.30 0
1980-06-04 Acid Treatment 960.70 986.30 0
1989-02-14 Cement Plug 972.60 986.30 0
1989-02-14 Open Hole/Barefoot Completion 960.70 972.60 0
1997-11-03 Packing Device Capped w/Cement 945.00 953.00 0
1997-11-04 Perforation 656.00 662.00 16
1997-11-19 Fracture 656.00 662.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 247 0.0 0.0 0.0
1998 8364 0.0 0.0 0.0
1999 8442 0.0 0.0 0.0
2000 8747 0.0 0.0 0.0
2001 8689 0.0 0.0 0.0
2002 8357 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8781 0.0 0.0 0.0
2005 8313 0.0 0.0 0.0
2006 8684 0.0 0.0 0.0
2007 7640 0.0 0.0 0.0
2008 8473 0.0 0.0 0.0
2009 7173 0.0 0.0 0.0
2010 8043 0.0 0.0 0.0
2011 8689 0.0 0.0 0.0
2012 8709 0.0 0.0 0.0
2013 8151 0.0 0.0 0.0
2014 6965 0.0 0.0 0.0
2015 8383 0.0 0.0 0.0
2016 8152 0.0 0.0 0.0
2017 8396 0.0 0.0 0.0
2018 7109 0.0 0.0 0.0
2019 7952 0.0 0.0 0.0
2020 1841 0.0 0.0 0.0

For data sources see[5]

References