X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564211502000

Well Details

Well ID: 0564211502000
Loading map...
Location: 00/02-15-056-21W4/0
Location Alias: 00/02-15-56-21 W4M
Location Alias 2: 00/02-15-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 15
County/Municipality: Strathcona County
Well Name: ACCEL HOLDINGS REDWATER 2-15-56-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001806
License Date: 1950-07-28
License Status: Abandoned
Spud Date: 1950-08-10
Final Drill Date: 1950-08-25
Well Total Depth: 996.70 m
Surface Hole Latitude: 53.834969
Surface Hole Longitude: -113.034086

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-28 Obtained License
1950-08-22 Production Casing Operation Performed
1950-08-25 Drill Stem Test Performed
1950-08-25 Finished Drilling
1950-08-25 Perforation Treatment Performed - Acid Wash - No Pressure
1950-08-25 Perforation Treatment Performed - Open-Hole Completion
1950-08-25 Well Mode changed to Drilled and Cased
1950-08-26 Well Began Production
1950-08-26 Well Fluid changed to Crude Oil
1950-08-26 Well Mode changed to Pumping
1955-04-13 Perforation Treatment Performed - Jet Perforation
1955-04-14 Perforation Treatment Performed - Acid Wash - No Pressure
1957-01-15 Perforation Treatment Performed - Acid Wash - No Pressure
1959-02-25 Perforation Treatment Performed - Jet Perforation
1959-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1998-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-07 Perforation Treatment Performed - Jet Perforation
1998-10-07 Plug Back Performed
1998-10-07 Well Log Performed
1998-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-21 Perforation Treatment Performed - Remedial Casing
1999-05-31 Well Abandoned
1999-05-31 Well Fluid changed to Crude Oil
1999-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-25 Open Hole/Barefoot Completion 985.10 996.70 0
1998-10-21 Remedial Casing Cementing 255.00 256.00 0
1998-10-21 Packing Device Capped w/Cement 205.00 280.00 0
1950-08-25 Acid Wash 985.10 996.70 0
1955-04-13 Perforation 988.50 989.70 13
1955-04-14 Acid Wash 988.50 989.70 0
1957-01-15 Acid Wash 988.50 989.70 0
1959-02-25 Perforation 988.20 990.30 7
1959-02-26 Acid Treatment 988.20 990.30 0
1998-10-07 Packing Device Capped w/Cement 962.00 970.00 0
1998-10-07 Perforation 255.00 256.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 427 0.0 0.0 0.0

For data sources see[5]

References