X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564211404002

Well Details

Well ID: 0564211404002
Loading map...
Location: 00/04-14-056-21W4/2
Location Alias: 00/04-14-56-21 W4M
Location Alias 2: 00/04-14-056-21 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 14
County/Municipality: Strathcona County
Well Name: ACCEL HOLDINGS REDWATER 4-14-56-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0002176
License Date: 1950-10-19
License Status: Abandoned
Spud Date: 1950-10-27
Final Drill Date: 1950-11-06
Well Total Depth: 996.10 m
Surface Hole Latitude: 53.834476
Surface Hole Longitude: -113.022024

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-10-19 Obtained License
1950-11-04 Production Casing Operation Performed
1950-11-06 Finished Drilling
1950-11-06 Perforation Treatment Performed - Acid Wash - No Pressure
1950-11-06 Perforation Treatment Performed - Open-Hole Completion
1950-11-06 Well Mode changed to Drilled and Cased
1955-11-16 Perforation Treatment Performed - Open-Hole Completion
1987-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-12-09 Plug Back Performed
1987-12-10 Perforation Treatment Performed - Jet Perforation
1987-12-13 Perforation Treatment Performed - Fractured
1987-12-21 Well Began Production
1987-12-21 Well Fluid changed to Crude Oil
1987-12-21 Well Mode changed to Pumping
1991-05-02 Perforation Treatment Performed - Chemical Squeeze
1992-02-01 Well Fluid changed to Crude Oil
1992-02-01 Well Mode changed to Suspended
1994-06-09 Well Log Performed
1994-06-17 Perforation Treatment Performed - Cement Squeeze
1994-06-17 Plug Back Performed
1994-06-17 Well Fluid changed to Crude Oil
1994-06-17 Well Mode changed to Abandoned Zone
1994-06-22 Perforation Treatment Performed - Jet Perforation
1994-06-22 Well Log Performed
2001-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-16 Plug Back Performed
2014-09-23 Well Log Performed
2014-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-30 Perforation Treatment Performed - Jet Perforation
2014-10-30 Perforation Treatment Performed - Remedial Casing
2014-10-30 Plug Back Performed
2014-10-30 Well Log Performed
2014-12-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-11-06 Open Hole/Barefoot Completion 974.10 996.10 0
2001-08-16 Packing Device Capped w/Cement 612.10 860.00 0
2014-10-30 Perforation 245.00 247.00 17
2014-10-30 Remedial Casing Cementing 245.00 247.00 0
2014-10-30 Packing Device Capped w/Cement 230.00 241.00 0
1950-11-06 Acid Wash 974.10 996.10 0
1955-11-16 Open Hole/Barefoot Completion 974.10 989.70 0
1987-12-09 Packing Device Capped w/Cement 942.70 950.00 0
1987-12-10 Perforation 660.80 665.80 13
1987-12-13 Fracture 660.80 665.80 0
1991-05-02 Chemical Squeeze 660.80 665.80 0
1994-06-17 Cement Squeeze 660.80 665.80 0
1994-06-22 Perforation 865.00 866.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 251 0.0 0.0 0.0
1988 6312 0.0 0.0 0.0
1989 6833 0.0 0.0 0.0
1990 3924 0.0 0.0 0.0
1991 339 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References