If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564153506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.879595,"lon":-112.12703,"icon":""}]} |
Location: 00/06-35-056-15W4/2 | |
Location Alias: 00/06-35-56-15 W4M | |
Location Alias 2: 00/06-35-056-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 15 | |
Section: 35 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: NORWEST WILDON 6-35-56-15 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0059177 | |
License Date: 1976-07-15 | |
License Status: RecCertified | |
Spud Date: 1976-07-28 | |
Final Drill Date: 1976-07-31 | |
Well Total Depth: 681.20 m | |
Surface Hole Latitude: 53.879595 | |
Surface Hole Longitude: -112.127030 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-07-15 | Obtained License |
1976-07-31 | Finished Drilling |
1976-07-31 | Well Mode changed to Drilled and Cased |
1976-08-01 | Drill Stem Test Performed |
1976-08-02 | Production Casing Operation Performed |
1976-09-08 | Perforation Treatment Performed - Jet Perforation |
1984-07-23 | Perforation Treatment Performed - Jet Perforation |
1984-07-23 | Well Log Performed |
1984-10-01 | Well Began Production |
1984-10-01 | Well Fluid changed to Gas |
1984-10-01 | Well Mode changed to Flowing |
1992-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-04-08 | Perforation Treatment Performed - Jet Perforation |
1992-04-08 | Plug Back Performed |
1992-04-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-04-09 | Perforation Treatment Performed - Jet Perforation |
1992-04-13 | Perforation Treatment Performed - Remedial Casing |
1992-04-13 | Well Fluid changed to Gas |
1992-04-13 | Well Mode changed to Abandoned |
1992-05-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-09-08 | Perforation | 571.20 | 572.40 | 7 |
1992-04-13 | Remedial Casing Cementing | 195.00 | 195.50 | 0 |
1984-07-23 | Perforation | 491.90 | 493.10 | 13 |
1984-07-23 | Perforation | 497.40 | 499.20 | 13 |
1984-07-23 | Perforation | 504.70 | 505.90 | 13 |
1992-04-08 | Packing Device Capped w/Cement | 553.60 | 561.60 | 0 |
1992-04-08 | Packing Device Capped w/Cement | 474.00 | 482.00 | 0 |
1992-04-08 | Perforation | 215.00 | 215.50 | 13 |
1992-04-09 | Acid Treatment | 215.00 | 215.50 | 0 |
1992-04-09 | Perforation | 195.00 | 195.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1272 | 0.0 | 0.0 | 0.0 |
1985 | 2909 | 0.0 | 0.0 | 0.0 |
1986 | 3312 | 0.0 | 0.0 | 0.0 |
1987 | 4337 | 0.0 | 0.0 | 0.0 |
1988 | 1426 | 0.0 | 0.0 | 0.0 |
For data sources see[5]