X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564152211000

Well Details

Well ID: 0564152211000
Loading map...
Location: 00/11-22-056-15W4/0
Location Alias: 00/11-22-56-15 W4M
Location Alias 2: 00/11-22-056-15 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 15
Section: 22
County/Municipality: County of Two Hills No. 21
Well Name: CNRL WILDON 11-22-56-15
Operator Name: Canadian Natural Resources Limited
License Number: 0081001
License Date: 1980-02-11
License Status: Abandoned
Spud Date: 1980-02-20
Final Drill Date: 1980-02-24
Well Total Depth: 693.00 m
Surface Hole Latitude: 53.853696
Surface Hole Longitude: -112.151975

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-11 Obtained License
1980-02-23 Drill Stem Test Performed
1980-02-24 Finished Drilling
1980-02-24 Lost Circulation Occurred
1980-02-25 Lost Circulation Occurred
1980-03-02 Production Casing Operation Performed
1980-03-02 Well Mode changed to Drilled and Cased
1980-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-26 Perforation Treatment Performed - Jet Perforation
1980-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-31 Perforation Treatment Performed - Jet Perforation
1980-06-02 Perforation Treatment Performed - Cement Squeeze
1980-06-02 Perforation Treatment Performed - Jet Perforation
1980-10-23 Well Began Production
1980-10-23 Well Fluid changed to Gas
1980-10-23 Well Mode changed to Flowing
1999-07-26 Well Fluid changed to Gas
1999-07-26 Well Mode changed to Suspended
2000-03-16 Well Fluid changed to Gas
2000-03-16 Well Mode changed to Flowing
2005-12-16 Perforation Treatment Performed - Jet Perforation
2005-12-16 Well Log Performed
2008-06-30 Well Fluid changed to Gas
2008-06-30 Well Mode changed to Suspended
2010-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-19 Plug Back Performed
2010-07-19 Well Fluid changed to Gas
2010-07-19 Well Mode changed to Abandoned Zone
2010-07-29 Well Log Performed
2010-08-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-26 Perforation 666.00 668.00 13
2010-07-19 Packing Device Capped w/Cement 490.00 498.00 0
1980-03-26 Acid Treatment 666.00 668.00 0
1980-05-31 Perforation 685.00 688.00 7
1980-05-31 Acid Treatment 666.00 688.00 0
1980-06-02 Cement Squeeze 666.00 688.00 0
1980-06-02 Perforation 638.00 640.50 13
2005-12-16 Perforation 508.50 509.50 17
2010-07-19 Packing Device Capped w/Cement 652.00 660.00 0
2010-07-19 Packing Device Capped w/Cement 624.00 632.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1622 0.0 0.0 0.0
1981 7220 0.0 0.0 0.0
1982 7040 0.0 0.0 0.0
1983 6261 0.0 0.0 0.0
1984 7004 0.0 0.0 0.0
1985 6416 0.0 0.0 0.0
1986 6716 0.0 0.0 0.0
1987 7378 0.0 0.0 0.0
1988 7000 0.0 0.0 0.0
1989 6640 0.0 0.0 0.0
1990 6066 0.0 0.0 0.0
1991 5663 0.0 0.0 0.0
1992 5849 0.0 0.0 0.0
1993 8540 0.0 0.0 0.0
1994 8747 0.0 0.0 0.0
1995 4372 0.0 0.0 0.0
1996 1887 0.0 0.0 0.0
2000 6937 0.0 0.0 0.0
2001 8576 0.0 0.0 0.0
2002 8716 0.0 0.0 0.0
2003 8347 0.0 0.0 0.0
2004 8562 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8015 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-02-24 Lost Circulation 693.00 693.00
1980-02-25 Lost Circulation 691.00 691.00

For data sources see[6]

References