X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564152110000

Well Details

Well ID: 0564152110000
Loading map...
Location: 00/10-21-056-15W4/0
Location Alias: 00/10-21-56-15 W4M
Location Alias 2: 00/10-21-056-15 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 15
Section: 21
County/Municipality: County of Two Hills No. 21
Well Name: HUBER ET AL WILLINGDON 10-21-56-15
Operator Name: J. M. Huber Corporation
License Number: 0060845
License Date: 1976-10-27
License Status: RecCertified
Spud Date: 1976-11-05
Final Drill Date: 1976-11-10
Well Total Depth: 702.60 m
Surface Hole Latitude: 53.856627
Surface Hole Longitude: -112.169724

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-27 Obtained License
1976-11-10 Finished Drilling
1976-11-11 Drill Stem Test Performed
1976-11-12 Drill Stem Test Performed
1976-11-13 Production Casing Operation Performed
1977-02-25 Perforation Treatment Performed - Jet Perforation
1977-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-28 Well Mode changed to Drilled and Cased
1980-07-15 Well Began Production
1980-07-15 Well Fluid changed to Gas
1980-07-15 Well Mode changed to Flowing
1981-03-25 Well Fluid changed to Gas
1981-03-25 Well Mode changed to Suspended
1988-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-05 Plug Back Performed
1988-03-05 Well Fluid changed to Gas
1988-03-05 Well Mode changed to Abandoned
1992-02-13 Well Log Performed
1992-02-17 Perforation Treatment Performed - Jet Perforation
1992-02-17 Perforation Treatment Performed - Remedial Casing
1993-04-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-25 Perforation 645.00 648.60 7
1977-02-27 Acid Treatment 645.00 648.60 0
1988-03-05 Packing Device Capped w/Cement 627.00 635.00 0
1992-02-17 Perforation 203.00 203.30 99
1992-02-17 Remedial Casing Cementing 203.00 203.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 3728 0.0 0.0 0.0
1981 2160 0.0 0.0 0.0

For data sources see[5]

References