X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564150608002

Well Details

Well ID: 0564150608002
Loading map...
Location: 00/08-06-056-15W4/2
Location Alias: 00/08-06-56-15 W4M
Location Alias 2: 00/08-06-056-15 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 15
Section: 06
County/Municipality: County of Two Hills No. 21
Well Name: PALOMA WILLINGDON 8-6-56-15
Operator Name: Sunoma Energy Corp.
License Number: 0092800
License Date: 1981-10-20
License Status: RecCertified
Spud Date: 1981-10-23
Final Drill Date: 1981-10-26
Well Total Depth: 712.00 m
Surface Hole Latitude: 53.808028
Surface Hole Longitude: -112.212974

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-20 Obtained License
1981-10-26 Finished Drilling
1981-10-26 Lost Circulation Occurred
1981-10-26 Well Mode changed to Drilled and Cased
1981-10-28 Drill Stem Test Performed
1981-10-29 Drill Stem Test Performed
1981-10-29 Production Casing Operation Performed
1981-11-10 Perforation Treatment Performed - Jet Perforation
1981-11-12 Perforation Treatment Performed - Jet Perforation
1982-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-18 Perforation Treatment Performed - Jet Perforation
1982-06-21 Perforation Treatment Performed - Fractured
1982-07-13 Well Began Production
1982-07-13 Well Fluid changed to Gas
1982-07-13 Well Mode changed to Flowing
1989-04-24 Well Fluid changed to Gas
1989-04-24 Well Mode changed to Suspended
1990-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-30 Perforation Treatment Performed - Cement Squeeze
1990-09-30 Plug Back Performed
1990-09-30 Well Fluid changed to Gas
1990-09-30 Well Mode changed to Abandoned
1990-11-07 Well Log Performed
1990-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-08 Perforation Treatment Performed - Jet Perforation
1990-11-08 Perforation Treatment Performed - Remedial Casing
1990-11-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-10 Perforation 680.00 681.00 7
1990-11-08 Acid Treatment 221.00 222.00 0
1990-11-08 Remedial Casing Cementing 221.00 222.00 0
1981-11-12 Perforation 681.00 682.00 7
1982-03-25 Acid Treatment 680.00 682.00 0
1982-06-17 Packing Device Capped w/Cement 667.00 675.00 0
1982-06-18 Perforation 654.00 655.50 7
1982-06-21 Fracture 654.00 655.50 0
1990-09-29 Acid Treatment 654.00 655.50 0
1990-09-30 Cement Squeeze 654.00 655.50 0
1990-11-08 Perforation 221.00 222.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2945 0.0 0.0 0.0
1983 6008 0.0 0.0 0.0
1984 4152 0.0 0.0 0.0
1985 3716 0.0 0.0 0.0
1986 2031 0.0 0.0 0.0
1988 2454 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-10-26 Lost Circulation 712.00 712.00

For data sources see[6]

References