X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564142116000

Well Details

Well ID: 0564142116000
Loading map...
Location: 00/16-21-056-14W4/0
Location Alias: 00/16-21-56-14 W4M
Location Alias 2: 00/16-21-056-14 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 14
Section: 21
County/Municipality: County of Two Hills No. 21
Well Name: PEOC HAIRY 16-21-56-14
Operator Name: Sequoia Resources Corp.
License Number: 0095910
License Date: 1982-05-14
License Status: Suspension
Spud Date: 1982-06-08
Final Drill Date: 1982-06-12
Well Total Depth: 675.00 m
Surface Hole Latitude: 53.857010
Surface Hole Longitude: -112.014844

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-05-14 Obtained License
1982-06-11 Drill Stem Test Performed
1982-06-12 Drill Stem Test Performed
1982-06-12 Finished Drilling
1982-06-12 Well Log Performed
1982-06-13 Production Casing Operation Performed
1982-06-13 Well Mode changed to Drilled and Cased
1982-08-13 Perforation Treatment Performed - Jet Perforation
1982-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-14 Perforation Treatment Performed - Jet Perforation
1982-08-15 Perforation Treatment Performed - Jet Perforation
1982-08-15 Well Mode changed to Drilled and Cased
1982-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-18 Perforation Treatment Performed - Jet Perforation
1982-10-14 Perforation Treatment Performed - Jet Perforation
1982-11-27 Well Began Production
1982-11-27 Well Fluid changed to Gas
1982-11-27 Well Mode changed to Flowing
1997-10-01 Well Fluid changed to Gas
1997-10-01 Well Mode changed to Suspended
2006-02-01 Well Fluid changed to Gas
2006-02-01 Well Mode changed to Flowing
2012-10-31 Well Fluid changed to Gas
2012-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-08-13 Perforation 661.00 662.50 7
1982-08-14 Packing Device Capped w/Cement 657.00 660.00 0
1982-08-14 Perforation 647.00 649.00 13
1982-08-15 Perforation 571.00 572.00 13
1982-08-16 Acid Treatment 571.00 572.00 0
1982-08-18 Perforation 647.00 649.00 13
1982-10-14 Perforation 646.50 648.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 840 0.0 0.0 0.0
1983 6278 0.0 0.0 0.0
1984 5351 0.0 0.0 0.0
1985 4312 0.0 0.0 0.0
1986 5185 0.0 0.0 0.0
1987 4837 0.0 0.0 0.0
1988 7390 0.0 0.0 0.0
1989 6791 0.0 0.0 0.0
1990 6542 0.0 0.0 0.0
1991 6677 0.0 0.0 0.0
1992 1865 0.0 0.0 0.0
2006 3603 0.0 0.0 0.0
2007 6521 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8374 0.0 0.0 0.0
2010 4189 0.0 0.0 0.0
2011 156 0.0 0.0 0.0

For data sources see[5]

References