X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564130910002

Well Details

Well ID: 0564130910002
Loading map...
Location: 00/10-09-056-13W4/2
Location Alias: 00/10-09-56-13 W4M
Location Alias 2: 00/10-09-056-13 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 13
Section: 09
County/Municipality: County of Two Hills No. 21
Well Name: PEOC HAIRY 10-9-56-13
Operator Name: Sequoia Resources Corp.
License Number: 0065742
License Date: 1977-09-16
License Status: Abandoned
Spud Date: 1977-10-12
Final Drill Date: 1977-10-15
Well Total Depth: 750.70 m
Surface Hole Latitude: 53.824335
Surface Hole Longitude: -111.872783

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-16 Obtained License
1977-10-15 Finished Drilling
1977-10-15 Well Mode changed to Drilled and Cased
1977-10-16 Production Casing Operation Performed
1977-10-25 Perforation Treatment Performed - Jet Perforation
1977-10-26 Perforation Treatment Performed - Fractured
1977-11-14 Well Began Production
1977-11-14 Well Fluid changed to Gas
1977-11-14 Well Mode changed to Flowing
1987-12-01 Well Fluid changed to Gas
1987-12-01 Well Mode changed to Suspended
1988-12-12 Well Log Performed
1988-12-14 Perforation Treatment Performed - Cement Squeeze
1988-12-14 Plug Back Performed
1988-12-14 Well Fluid changed to Gas
1988-12-14 Well Mode changed to Abandoned Zone
1988-12-19 Perforation Treatment Performed - Cement Squeeze
1988-12-19 Perforation Treatment Performed - Jet Perforation
1988-12-20 Perforation Treatment Performed - Jet Perforation
1988-12-20 Well Log Performed
1997-11-10 Perforation Treatment Performed - Jet Perforation
1997-11-12 Perforation Treatment Performed - Jet Perforation
1997-12-10 Well Log Performed
1997-12-11 Well Log Performed
1998-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-16 Perforation Treatment Performed - Jet Perforation
1998-05-16 Plug Back Performed
1998-05-16 Well Log Performed
1998-05-22 Perforation Treatment Performed - Jet Perforation
1998-05-22 Well Log Performed
1998-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-24 Plug Back Performed
1998-05-24 Well Log Performed
1998-05-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-25 Perforation 564.50 565.70 10
1997-11-10 Perforation 692.50 698.00 13
1997-11-12 Perforation 563.90 566.40 20
1998-05-16 Packing Device Capped w/Cement 667.00 675.00 0
1998-05-16 Packing Device Capped w/Cement 547.00 555.00 0
1998-05-16 Perforation 452.30 456.30 20
1998-05-22 Perforation 477.30 482.30 20
1998-05-24 Packing Device Capped w/Cement 465.00 473.00 0
1998-05-24 Packing Device Capped w/Cement 439.00 447.00 0
1977-10-25 Perforation 566.30 567.20 10
1977-10-25 Perforation 568.80 569.40 10
1977-10-25 Perforation 524.30 526.10 10
1977-10-26 Fracture 524.30 526.10 0
1988-12-14 Cement Squeeze 524.30 569.40 0
1988-12-19 Perforation 576.00 577.80 13
1988-12-19 Cement Squeeze 576.00 577.80 0
1988-12-20 Perforation 563.90 566.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1344 0.0 0.0 0.0
1978 7407 0.0 0.0 0.0
1979 7663 0.0 0.0 0.0
1980 8315 0.0 0.0 0.0
1981 5955 0.0 0.0 0.0
1982 8411 0.0 0.0 0.0
1983 6363 0.0 0.0 0.0
1984 8736 0.0 0.0 0.0
1985 7979 0.0 0.0 0.0
1986 6107 0.0 0.0 0.0

For data sources see[5]

References