X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564110610003

Well Details

Well ID: 0564110610003
Loading map...
Location: 00/10-06-056-11W4/3
Location Alias: 00/10-06-56-11 W4M
Location Alias 2: 00/10-06-056-11 W4/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 11
Section: 06
County/Municipality: County of Two Hills No. 21
Well Name: CNRL DUV 10-6-56-11
Operator Name: Canadian Natural Resources Limited
License Number: 0097628
License Date: 1982-09-29
License Status: Suspension
Spud Date: 1982-10-13
Final Drill Date: 1994-02-17
Well Total Depth: 647.00 m
Surface Hole Latitude: 53.810894
Surface Hole Longitude: -111.624156

For data sources see[1][2]

Well History

Date Event
1982-09-29 Obtained License
1989-03-02 Perforation Treatment Performed - Jet Perforation
1989-03-10 Perforation Treatment Performed - Fractured
1994-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-03 Perforation Treatment Performed - Cement Squeeze
1994-02-03 Plug Back Performed
1994-02-17 Finished Drilling
1994-02-17 Well Log Performed
1994-02-17 Well Mode changed to Drilled and Cased
1994-02-18 Liner Casing Operation Performed
1994-02-28 Perforation Treatment Performed - Jet Perforation
1994-02-28 Rig Released
2003-09-03 Perforation Treatment Performed - Jet Perforation
2003-09-03 Well Log Performed
2008-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-09 Perforation Treatment Performed - Jet Perforation
2008-08-09 Plug Back Performed
2008-08-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-02 Perforation 480.50 482.50 13
2008-08-09 Perforation 443.50 445.50 17
1989-03-02 Perforation 485.00 486.00 13
1989-03-10 Fracture 480.50 486.00 0
1994-01-31 Acid Treatment 480.50 486.00 0
1994-02-03 Cement Squeeze 480.50 486.00 0
1994-02-28 Perforation 599.00 600.50 20
2003-09-03 Perforation 599.00 602.00 13
2003-09-03 Perforation 607.50 608.50 13
2008-08-09 Packing Device Capped w/Cement 582.00 592.00 0

For data sources see[4]



References