X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564011115AB0

Well Details

Well ID: 0564011115AB0
Loading map...
Location: AB/15-11-056-01W4/0
Location Alias: AB/15-11-56-01 W4M
Location Alias 2: AB/15-11-056-01 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 01
Section: 11
County/Municipality: County of Vermilion River
Well Name: AMOCO AB JOHN LAKE EX 15-11-56-1
Operator Name: BP Canada Energy Group ULC
License Number: 0103022
License Date: 1983-09-12
License Status: RecCertified
Spud Date: 1983-09-20
Final Drill Date: 1983-09-25
Well Total Depth: 630.00 m
Surface Hole Latitude: 53.828042
Surface Hole Longitude: -110.042032

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-12 Obtained License
1983-09-21 Surface Casing Operation Performed
1983-09-25 Finished Drilling
1983-09-25 Well Log Performed
1983-09-25 Well Mode changed to Drilled and Cased
1983-09-26 Rig Released
1983-11-02 Perforation Treatment Performed - Jet Perforation
1983-12-09 Well Began Production
1983-12-09 Well Fluid changed to Crude Bitumen
1983-12-09 Well Type changed to Cyclical
1985-03-24 Well Fluid changed to Crude Bitumen
1985-03-24 Well Mode changed to Suspended
1985-03-24 Well Type changed to Cyclical
1990-05-31 Well Log Performed
1997-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-26 Plug Back Performed
1997-04-26 Well Fluid changed to Crude Bitumen
1997-04-26 Well Mode changed to Abandoned Zone
1997-04-26 Well Type changed to Cyclical
1997-04-27 Perforation Treatment Performed - Jet Perforation
1997-04-27 Well Log Performed
1997-05-07 Perforation Treatment Performed - Remedial Casing
1997-07-05 Perforation Treatment Performed - Jet Perforation
1997-07-05 Well Log Performed
1997-07-06 Perforation Treatment Performed - Remedial Casing
1997-07-07 Perforation Treatment Performed - Cement Plug
1997-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-14 Plug Back Performed
1997-07-14 Well Log Performed
1997-07-16 Well Abandoned
1997-07-16 Well Fluid changed to Crude Bitumen
1997-07-16 Well Mode changed to Abandoned
1997-07-16 Well Type changed to Cyclical

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-02 Perforation 589.00 596.50 7
1997-04-26 Packing Device Capped w/Cement 384.00 563.00 0
1997-04-27 Perforation 216.00 217.00 13
1997-05-07 Remedial Casing Cementing 216.00 217.00 0
1997-07-05 Perforation 140.00 141.00 13
1997-07-05 Perforation 155.00 156.00 13
1997-07-06 Remedial Casing Cementing 140.00 156.00 0
1997-07-07 Cement Plug 137.00 156.00 0
1997-07-14 Packing Device Capped w/Cement 115.30 123.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 552 0.0 0.0 0.0
1984 6892 0.0 0.0 0.0
1985 1992 0.0 0.0 0.0

For data sources see[5]

References