If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0555181710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.754175,"lon":-116.636252,"icon":""}]} |
Location: 00/10-17-055-18W5/0 | |
Location Alias: 00/10-17-55-18 W5M | |
Location Alias 2: 00/10-17-055-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 5 | |
Range: 18 | |
Section: 17 | |
County/Municipality: Yellowhead County | |
Well Name: HB ET AL MARLBORO 10-17-55-18 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0027572 | |
License Date: 1965-01-19 | |
License Status: RecCertified | |
Spud Date: 1965-02-01 | |
Final Drill Date: 1965-04-21 | |
Well Total Depth: 3467.10 m | |
Surface Hole Latitude: 53.754175 | |
Surface Hole Longitude: -116.636252 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-01-19 | Obtained License |
1965-02-23 | Drill Stem Test Performed |
1965-04-10 | Drill Stem Test Performed |
1965-04-12 | Drill Stem Test Performed |
1965-04-14 | Drill Stem Test Performed |
1965-04-15 | Drill Stem Test Performed |
1965-04-21 | Finished Drilling |
1965-04-25 | Drill Stem Test Performed |
1965-04-26 | Drill Stem Test Performed |
1965-04-27 | Drill Stem Test Performed |
1965-04-28 | Drill Stem Test Performed |
1965-05-03 | Well Abandoned |
1965-05-03 | Well Mode changed to Abandoned |
For data sources see[3]