X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555052012005

Well Details

Well ID: 0555052012005
Loading map...
Location: 00/12-20-055-05W5/5
Location Alias: 00/12-20-55-05 W5M
Location Alias 2: 00/12-20-055-05 W5/05
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 05
Section: 20
County/Municipality: Lac Ste. Anne County
Well Name: OUTPOST CHERHILL 12-20-55-5
Operator Name: Outpost Energy Ltd.
License Number: 0112698
License Date: 1985-01-22
License Status: Suspension
Spud Date: 1985-01-26
Final Drill Date: 1985-02-04
Well Total Depth: 1525.00 m
Surface Hole Latitude: 53.768703
Surface Hole Longitude: -114.719682

For data sources see[1][2]

Well History

Date Event
1985-01-22 Obtained License
1985-01-27 Surface Casing Operation Performed
1985-02-04 Finished Drilling
1985-02-04 Well Log Performed
1985-02-04 Well Mode changed to Drilled and Cased
1985-02-05 Drill Stem Test Performed
1985-02-05 Well Log Performed
1985-02-06 Drill Stem Test Performed
1985-02-07 Drill Stem Test Performed
1985-02-09 Drill Stem Test Performed
1985-02-10 Production Casing Operation Performed
1985-02-10 Rig Released
1985-06-14 Well Log Performed
1985-06-15 Perforation Treatment Performed - Jet Perforation
1985-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-23 Perforation Treatment Performed - Cement Squeeze
1985-06-23 Plug Back Performed
1985-06-26 Well Log Performed
1985-06-27 Perforation Treatment Performed - Jet Perforation
1985-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-04 Plug Back Performed
2002-06-06 Perforation Treatment Performed - Jet Perforation
2002-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-11 Plug Back Performed
2002-06-12 Perforation Treatment Performed - Jet Perforation
2002-06-15 Perforation Treatment Performed - Jet Perforation
2008-06-17 Perforation Treatment Performed - Jet Perforation
2008-06-17 Well Log Performed
2008-06-19 Well Began Production
2008-06-19 Well Fluid changed to Gas
2008-06-19 Well Mode changed to Flowing
2011-08-31 Well Fluid changed to Gas
2011-08-31 Well Mode changed to Suspended
2011-11-28 Well Fluid changed to Gas
2011-11-28 Well Mode changed to Flowing
2015-03-31 Well Fluid changed to Gas
2015-03-31 Well Mode changed to Suspended
2018-09-13 Well Fluid changed to Gas
2018-09-13 Well Mode changed to Flowing
2018-11-30 Well Fluid changed to Gas
2018-11-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-15 Perforation 1457.50 1459.50 13
2002-06-06 Perforation 1414.00 1416.00 17
2002-06-07 Acid Treatment 1414.00 1416.00 0
2002-06-11 Packing Device Capped w/Cement 1399.00 1407.00 0
2002-06-12 Perforation 1265.00 1269.00 17
2002-06-15 Perforation 1231.00 1232.50 17
2008-06-17 Perforation 1360.50 1362.00 20
1985-06-19 Acid Treatment 1457.50 1459.50 0
1985-06-23 Cement Squeeze 1457.50 1459.50 0
1985-06-27 Perforation 1444.50 1446.50 13
1985-06-27 Perforation 1447.00 1448.00 13
1985-06-27 Perforation 1450.50 1453.00 13
1985-07-04 Acid Treatment 1444.50 1453.00 0
1985-07-07 Acid Treatment 1444.50 1453.00 0
2002-06-04 Packing Device Capped w/Cement 1433.00 1441.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4544 0.0 0.0 0.0
2009 8570 0.0 0.0 0.0
2010 5114 0.0 0.0 0.0
2011 803 0.0 0.0 0.0
2012 8560 0.0 0.0 0.0
2013 8578 0.0 0.0 0.0
2014 6402 0.0 0.0 0.0
2015 118 0.0 0.0 0.0
2018 11 0.0 0.0 0.0

For data sources see[5]

References