X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554263201000

Well Details

Well ID: 0554263201000
Loading map...
Location: 00/01-32-055-26W4/0
Location Alias: 00/01-32-55-26 W4M
Location Alias 2: 00/01-32-055-26 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 26
Section: 32
County/Municipality: Sturgeon County
Well Name: NORCEN ALEXANDER 1-32-55-26
Operator Name: Canadian Natural Resources Limited
License Number: 0000466
License Date: 1949-08-12
License Status: RecCertified
Spud Date: 1949-08-18
Final Drill Date: 1949-10-17
Well Total Depth: 1828.80 m
Surface Hole Latitude: 53.790753
Surface Hole Longitude: -113.821799

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-08-12 Obtained License
1949-08-29 Drill Stem Test Performed
1949-08-31 Drill Stem Test Performed
1949-09-01 Drill Stem Test Performed
1949-09-02 Drill Stem Test Performed
1949-09-03 Drill Stem Test Performed
1949-09-04 Drill Stem Test Performed
1949-09-08 Drill Stem Test Performed
1949-09-10 Drill Stem Test Performed
1949-09-11 Drill Stem Test Performed
1949-09-12 Drill Stem Test Performed
1949-09-14 Drill Stem Test Performed
1949-09-15 Drill Stem Test Performed
1949-09-16 Drill Stem Test Performed
1949-09-18 Drill Stem Test Performed
1949-09-19 Drill Stem Test Performed
1949-09-20 Drill Stem Test Performed
1949-09-21 Drill Stem Test Performed
1949-09-22 Drill Stem Test Performed
1949-09-23 Drill Stem Test Performed
1949-09-27 Drill Stem Test Performed
1949-09-30 Drill Stem Test Performed
1949-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1949-10-01 Perforation Treatment Performed - Bullet Perforation
1949-10-17 Finished Drilling
1949-10-18 Drill Stem Test Performed
1949-10-19 Production Casing Operation Performed
1949-11-01 Well Mode changed to Drilled and Cased
1949-11-04 Drill Stem Test Performed
1949-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1949-11-04 Perforation Treatment Performed - Bullet Perforation
1960-07-29 Well Began Production
1960-07-29 Well Fluid changed to Gas
1960-07-29 Well Mode changed to Flowing
1983-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-09 Well Abandoned
1983-08-09 Well Fluid changed to Gas
1983-08-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-10-01 Bullet Perforation 1158.80 1159.80 26
1949-10-01 Acid Wash 1158.80 1159.80 0
1949-10-01 Bullet Perforation 1228.00 1232.60 20
1949-10-01 Acid Wash 1228.00 1232.60 0
1949-11-04 Bullet Perforation 1157.90 1158.20 20
1949-11-04 Packing Device Capped w/Cement 1227.70 1227.70 0
1949-11-04 Packing Device Capped w/Cement 1158.50 1158.50 0
1983-08-09 Packing Device Capped w/Cement 1149.00 1149.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 5856 0.0 0.0 0.0
1970 4727 0.0 0.0 0.0
1971 8471 0.0 0.0 0.0
1972 7760 0.0 0.0 0.0
1973 7113 0.0 0.0 0.0
1974 8711 0.0 0.0 0.0
1975 2616 0.0 0.0 0.0
1976 1872 0.0 0.0 0.0
1977 2232 0.0 0.0 0.0
1978 8135 0.0 0.0 0.0
1979 8135 0.0 0.0 0.0
1980 7559 0.0 0.0 0.0
1981 8351 0.0 0.0 0.0
1982 6524 0.0 0.0 0.0
1983 3816 0.0 0.0 0.0

For data sources see[5]

References