X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554213610000

Well Details

Well ID: 0554213610000
Loading map...
Location: 00/10-36-055-21W4/0
Location Alias: 00/10-36-55-21 W4M
Location Alias 2: 00/10-36-055-21 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 21
Section: 36
County/Municipality: Strathcona County
Well Name: RSO REDWATER 10-36-55-21
Operator Name: Rifle Shot Oil Corp.
License Number: 0299723
License Date: 2003-12-22
License Status: Suspension
Spud Date: 2004-01-13
Final Drill Date: 2004-01-17
Well Total Depth: 940.00 m
Surface Hole Latitude: 53.797545
Surface Hole Longitude: -112.986819

For data sources see[1][2]

Well History

Date Event
2003-12-22 Obtained License
2004-01-14 Surface Casing Operation Performed
2004-01-15 Kick Occurred
2004-01-17 Finished Drilling
2004-01-17 Well Log Performed
2004-01-17 Well Mode changed to Drilled and Cased
2004-01-18 Production Casing Operation Performed
2004-01-18 Rig Released
2004-01-25 Well Log Performed
2004-02-02 Perforation Treatment Performed - Jet Perforation
2004-02-02 Well Log Performed
2004-02-12 Perforation Treatment Performed - Fractured
2004-02-23 Perforation Treatment Performed - Jet Perforation
2004-02-25 Perforation Treatment Performed - Fractured
2004-03-10 Well Began Production
2004-03-10 Well Fluid changed to Crude Oil
2004-03-10 Well Mode changed to Flowing
2005-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-30 Plug Back Performed
2005-06-30 Well Abandoned
2005-06-30 Well Fluid changed to Crude Oil
2005-06-30 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-02 Perforation 884.50 888.50 14
2004-02-12 Fracture 884.50 888.50 0
2004-02-23 Perforation 881.80 883.80 14
2004-02-25 Fracture 881.80 888.50 0
2005-06-30 Packing Device Capped w/Cement 870.00 878.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1064 0.0 0.0 0.0
2005 240 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-01-15 Kick 315.00 315.00

For data sources see[6]

References