If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0554153216002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.799398,"lon":-112.188197,"icon":""}]} |
Location: 00/16-32-055-15W4/2 | |
Location Alias: 00/16-32-55-15 W4M | |
Location Alias 2: 00/16-32-055-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 4 | |
Range: 15 | |
Section: 32 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: WHITE RAM WILDON 16-32-55-15 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0089143 | |
License Date: 1981-02-23 | |
License Status: Abandoned | |
Spud Date: 1981-02-24 | |
Final Drill Date: 1981-02-28 | |
Well Total Depth: 729.00 m | |
Surface Hole Latitude: 53.799398 | |
Surface Hole Longitude: -112.188197 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-02-23 | Obtained License |
1981-02-28 | Drill Stem Test Performed |
1981-02-28 | Finished Drilling |
1981-02-28 | Well Log Performed |
1981-03-01 | Production Casing Operation Performed |
1981-03-06 | Perforation Treatment Performed - Jet Perforation |
1981-03-07 | Perforation Treatment Performed - Jet Perforation |
1981-08-13 | Well Mode changed to Drilled and Cased |
1982-02-22 | Well Began Production |
1982-02-22 | Well Fluid changed to Gas |
1982-02-22 | Well Mode changed to Flowing |
1989-12-01 | Well Fluid changed to Gas |
1989-12-01 | Well Mode changed to Suspended |
1990-03-04 | Well Fluid changed to Gas |
1990-03-04 | Well Mode changed to Flowing |
1993-11-10 | Well Log Performed |
1993-11-11 | Perforation Treatment Performed - Jet Perforation |
1993-11-18 | Perforation Treatment Performed - Jet Perforation |
1993-11-18 | Well Log Performed |
1993-11-20 | Well Fluid changed to Gas |
1993-11-20 | Well Mode changed to Pumping |
2008-01-01 | Well Fluid changed to Gas |
2008-01-01 | Well Mode changed to Suspended |
2010-10-26 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2010-10-26 | Plug Back Performed |
2010-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-28 | Perforation Treatment Performed - Cement Squeeze |
2010-10-28 | Plug Back Performed |
2010-10-28 | Well Fluid changed to Gas |
2010-10-28 | Well Mode changed to Abandoned Zone |
2010-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-10-29 | Perforation Treatment Performed - Cement Plug |
2010-10-29 | Perforation Treatment Performed - Cement Squeeze |
2010-10-29 | Plug Back Performed |
2010-10-31 | Perforation Treatment Performed - Jet Perforation |
2010-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-01 | Perforation Treatment Performed - Remedial Casing |
2011-02-22 | Perforation Treatment Performed - Jet Perforation |
2011-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-05 | Perforation Treatment Performed - Remedial Casing |
2011-03-09 | Perforation Treatment Performed - Cement Plug |
2011-03-09 | Perforation Treatment Performed - Jet Perforation |
2011-03-09 | Perforation Treatment Performed - Remedial Casing |
2011-03-15 | Perforation Treatment Performed - Jet Perforation |
2011-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-16 | Perforation Treatment Performed - Remedial Casing |
2011-03-21 | Perforation Treatment Performed - Jet Perforation |
2011-03-22 | Perforation Treatment Performed - Remedial Casing |
2011-03-25 | Perforation Treatment Performed - Jet Perforation |
2011-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-26 | Perforation Treatment Performed - Remedial Casing |
2011-03-31 | Perforation Treatment Performed - Cement Plug |
2011-03-31 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-03-06 | Perforation | 650.50 | 652.00 | 7 |
2010-10-29 | Cement Squeeze | 503.00 | 506.00 | 0 |
2010-10-29 | Cement Plug | 483.00 | 518.60 | 0 |
2010-10-31 | Perforation | 379.00 | 380.00 | 17 |
2010-11-01 | Remedial Casing Cementing | 379.00 | 380.00 | 0 |
2010-11-01 | Packing Device Capped w/Cement | 368.00 | 376.50 | 0 |
2011-02-22 | Perforation | 346.00 | 347.00 | 14 |
2011-02-22 | Perforation | 330.00 | 331.00 | 14 |
2011-03-05 | Acid Treatment | 346.00 | 347.00 | 0 |
2011-03-05 | Remedial Casing Cementing | 330.00 | 347.00 | 0 |
2011-03-05 | Packing Device Capped w/Cement | 314.00 | 343.00 | 0 |
1981-03-07 | Perforation | 652.00 | 653.00 | 7 |
2011-03-09 | Perforation | 277.00 | 278.00 | 14 |
2011-03-09 | Remedial Casing Cementing | 277.00 | 278.00 | 0 |
2011-03-09 | Cement Plug | 261.00 | 278.00 | 0 |
2011-03-15 | Perforation | 227.00 | 228.00 | 14 |
2011-03-16 | Remedial Casing Cementing | 227.00 | 228.00 | 0 |
2011-03-16 | Packing Device Capped w/Cement | 212.00 | 224.00 | 0 |
2011-03-21 | Perforation | 195.00 | 196.00 | 14 |
2011-03-22 | Remedial Casing Cementing | 195.00 | 196.00 | 0 |
2011-03-25 | Perforation | 181.00 | 182.00 | 20 |
2011-03-26 | Remedial Casing Cementing | 181.00 | 182.00 | 0 |
1981-03-07 | Perforation | 659.00 | 660.00 | 7 |
2011-03-26 | Packing Device Capped w/Cement | 178.00 | 192.00 | 0 |
2011-03-26 | Packing Device Capped w/Cement | 170.00 | 178.00 | 0 |
2011-03-31 | Cement Plug | 167.00 | 170.00 | 0 |
1993-11-11 | Perforation | 503.00 | 506.00 | 13 |
1993-11-18 | Perforation | 653.00 | 654.00 | 14 |
2010-10-26 | Packing Dev Cpd w/Res-Gyp Cem | 654.00 | 657.00 | 0 |
2010-10-28 | Cement Squeeze | 650.50 | 654.00 | 0 |
2010-10-28 | Packing Device Capped w/Cement | 635.00 | 645.00 | 0 |
2010-10-29 | Acid Treatment | 503.00 | 506.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 2985 | 0.0 | 0.0 | 0.0 |
1983 | 3330 | 0.0 | 0.0 | 0.0 |
1984 | 2375 | 0.0 | 0.0 | 0.0 |
1985 | 4243 | 0.0 | 0.0 | 0.0 |
1986 | 1146 | 0.0 | 0.0 | 0.0 |
1987 | 994 | 0.0 | 0.0 | 0.0 |
1988 | 4451 | 0.0 | 0.0 | 0.0 |
1989 | 5174 | 0.0 | 0.0 | 0.0 |
1990 | 3194 | 0.0 | 0.0 | 0.0 |
1991 | 6143 | 0.0 | 0.0 | 0.0 |
1992 | 7143 | 0.0 | 0.0 | 0.0 |
1993 | 8430 | 0.0 | 0.0 | 0.0 |
1994 | 8633 | 0.0 | 0.0 | 0.0 |
1995 | 6819 | 0.0 | 0.0 | 0.0 |
1996 | 6289 | 0.0 | 0.0 | 0.0 |
1997 | 8205 | 0.0 | 0.0 | 0.0 |
1999 | 3428 | 0.0 | 0.0 | 0.0 |
2000 | 7795 | 0.0 | 0.0 | 0.0 |
2001 | 8564 | 0.0 | 0.0 | 0.0 |
2002 | 8548 | 0.0 | 0.0 | 0.0 |
2003 | 8725 | 0.0 | 0.0 | 0.0 |
2004 | 8440 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]