X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554150107002

Well Details

Well ID: 0554150107002
Loading map...
Location: 00/07-01-055-15W4/2
Location Alias: 00/07-01-55-15 W4M
Location Alias 2: 00/07-01-055-15 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 15
Section: 01
County/Municipality: County of Two Hills No. 21
Well Name: OMERS ENERGY HAIRY 7-1-55-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0259429
License Date: 2001-09-12
License Status: Abandoned
Spud Date: 2001-10-09
Final Drill Date: 2001-10-29
Well Total Depth: 670.30 m
Surface Hole Latitude: 53.720839
Surface Hole Longitude: -112.090735

For data sources see[1][2]

Well History

Date Event
2001-09-12 Obtained License
2001-10-09 Surface Casing Operation Performed
2001-10-11 Production Casing Operation Performed
2001-10-11 Well Log Performed
2001-10-12 Rig Released
2001-10-29 Finished Drilling
2001-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-29 Perforation Treatment Performed - Jet Perforation
2001-10-29 Perforation Treatment Performed - Open-Hole Completion
2001-10-29 Well Mode changed to Drilled and Cased
2001-10-30 Perforation Treatment Performed - Fractured
2001-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-24 Well Began Production
2001-11-24 Well Fluid changed to Gas
2001-11-24 Well Mode changed to Flowing
2004-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-27 Perforation Treatment Performed - Jet Perforation
2004-06-27 Plug Back Performed
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2017-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-19 Plug Back Performed
2017-09-19 Well Fluid changed to Gas
2017-09-19 Well Mode changed to Abandoned Zone
2017-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-20 Plug Back Performed
2017-10-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-10-29 Open Hole/Barefoot Completion 655.00 670.30 0
2017-09-19 Packing Device Capped w/Cement 602.00 610.00 0
2017-09-20 Packing Device Capped w/Cement 540.00 548.00 0
2001-10-29 Acid Treatment 655.00 667.00 0
2001-10-29 Acid Treatment 655.00 669.10 0
2001-10-29 Perforation 617.00 619.50 13
2001-10-30 Fracture 617.00 619.50 0
2001-11-15 Acid Treatment 655.00 670.30 0
2001-11-15 Acid Treatment 617.00 619.50 0
2004-06-27 Perforation 555.60 559.00 17
2004-06-27 Packing Device Capped w/Cement 637.00 645.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 911 0.0 0.0 0.0
2002 7642 0.0 0.0 0.0
2003 2333 0.0 0.0 0.0
2004 2259 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References