X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554143507000

Well Details

Well ID: 0554143507000
Loading map...
Location: 00/07-35-055-14W4/0
Location Alias: 00/07-35-55-14 W4M
Location Alias 2: 00/07-35-055-14 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 14
Section: 35
County/Municipality: County of Two Hills No. 21
Well Name: NORWEST HAIRY HILL 7-35-55-14
Operator Name: Canadian Natural Resources Limited
License Number: 0008559
License Date: 1954-10-07
License Status: RecCertified
Spud Date: 1954-10-10
Final Drill Date: 1954-10-18
Well Total Depth: 662.90 m
Surface Hole Latitude: 53.793184
Surface Hole Longitude: -111.969619

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-07 Obtained License
1954-10-14 Drill Stem Test Performed
1954-10-15 Drill Stem Test Performed
1954-10-16 Drill Stem Test Performed
1954-10-17 Drill Stem Test Performed
1954-10-18 Finished Drilling
1954-10-18 Production Casing Operation Performed
1954-10-18 Well Mode changed to Drilled and Cased
1954-10-22 Perforation Treatment Performed - Bullet Perforation
1955-08-26 Well Began Production
1955-08-26 Well Fluid changed to Gas
1955-08-26 Well Mode changed to Flowing
1978-06-12 Perforation Treatment Performed - Cement Squeeze
1978-06-14 Perforation Treatment Performed - Open-Hole Completion
1978-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-15 Perforation Treatment Performed - Jet Perforation
1978-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-17 Perforation Treatment Performed - Nitrogen Treatment
1978-06-17 Well Fluid changed to Gas
1978-06-17 Well Mode changed to Flowing
1981-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-08-05 Perforation Treatment Performed - Jet Perforation
1981-08-05 Well Fluid changed to Gas
1981-08-05 Well Mode changed to Flowing
1991-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-20 Plug Back Performed
1991-08-20 Well Fluid changed to Gas
1991-08-20 Well Mode changed to Abandoned Zone
1991-08-21 Perforation Treatment Performed - Jet Perforation
1991-08-21 Perforation Treatment Performed - Remedial Casing
1991-10-03 Perforation Treatment Performed - Jet Perforation
1991-10-03 Perforation Treatment Performed - Remedial Casing
1991-10-03 Well Log Performed
1991-10-07 Perforation Treatment Performed - Jet Perforation
1991-10-07 Well Log Performed
1991-10-09 Well Log Performed
1991-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-11 Perforation Treatment Performed - Jet Perforation
1991-10-11 Well Log Performed
1991-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-17 Perforation Treatment Performed - Remedial Casing
1992-05-26 Well Abandoned
2005-07-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-22 Bullet Perforation 537.40 538.90 20
1981-08-05 Perforation 482.20 483.10 13
1991-08-20 Packing Device Capped w/Cement 507.00 515.00 0
1991-08-20 Packing Device Capped w/Cement 467.00 475.00 0
1991-08-21 Perforation 180.00 181.50 13
1991-08-21 Remedial Casing Cementing 180.00 181.50 0
1991-10-03 Perforation 391.00 391.70 13
1991-10-03 Remedial Casing Cementing 391.00 391.70 0
1991-10-07 Perforation 199.00 200.00 13
1991-10-11 Packing Device Capped w/Cement 185.00 193.00 0
1991-10-11 Perforation 112.00 112.30 72
1954-10-22 Bullet Perforation 534.60 536.10 20
1991-10-11 Perforation 100.00 101.00 13
1991-10-16 Acid Treatment 100.00 112.30 0
1991-10-17 Remedial Casing Cementing 100.00 112.30 0
1978-06-12 Cement Squeeze 534.60 538.90 0
1978-06-14 Open Hole/Barefoot Completion 653.80 662.90 0
1978-06-15 Perforation 521.80 527.30 13
1978-06-15 Acid Treatment 653.80 662.90 0
1978-06-17 Acid Treatment 653.80 662.90 0
1978-06-17 Nitrogen Treatment 521.80 527.30 0
1981-08-05 Packing Device Capped w/Cement 641.00 649.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8437 0.0 0.0 0.0
1970 8379 0.0 0.0 0.0
1971 8651 0.0 0.0 0.0
1972 8719 0.0 0.0 0.0
1973 8394 0.0 0.0 0.0
1974 4256 0.0 0.0 0.0
1975 7357 0.0 0.0 0.0
1976 8052 0.0 0.0 0.0
1977 7425 0.0 0.0 0.0
1978 7983 0.0 0.0 0.0
1979 7397 0.0 0.0 0.0
1980 6376 0.0 0.0 0.0
1981 7731 0.0 0.0 0.0
1982 5803 0.0 0.0 0.0
1983 6579 0.0 0.0 0.0
1984 6522 0.0 0.0 0.0
1985 4524 0.0 0.0 0.0
1986 5137 0.0 0.0 0.0
1987 7590 0.0 0.0 0.0
1988 240 0.0 0.0 0.0
1989 6326 0.0 0.0 0.0

For data sources see[5]

References