X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554140711000

Well Details

Well ID: 0554140711000
Loading map...
Location: 00/11-07-055-14W4/0
Location Alias: 00/11-07-55-14 W4M
Location Alias 2: 00/11-07-055-14 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 14
Section: 07
County/Municipality: County of Two Hills No. 21
Well Name: OMERS ENERGY HAIRY 11-7-55-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0105280
License Date: 1984-01-16
License Status: Suspension
Spud Date: 1984-01-25
Final Drill Date: 1984-01-28
Well Total Depth: 700.00 m
Surface Hole Latitude: 53.738157
Surface Hole Longitude: -112.073596

For data sources see[1][2]

Well History

Date Event
1984-01-16 Obtained License
1984-01-28 Finished Drilling
1984-01-28 Well Log Performed
1984-01-29 Drill Stem Test Performed
1984-01-29 Production Casing Operation Performed
1984-02-15 Well Log Performed
1984-02-16 Well Log Performed
1984-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-17 Perforation Treatment Performed - Jet Perforation
1984-03-05 Well Mode changed to Drilled and Cased
1984-07-03 Well Began Production
1984-07-03 Well Fluid changed to Gas
1984-07-03 Well Mode changed to Flowing
1984-10-13 Perforation Treatment Performed - Cement Squeeze
1984-10-13 Perforation Treatment Performed - Jet Perforation
1984-10-13 Well Log Performed
1984-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-15 Perforation Treatment Performed - Jet Perforation
1997-03-15 Well Log Performed
1997-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-16 Perforation Treatment Performed - Jet Perforation
1997-03-16 Plug Back Performed
1997-03-16 Well Fluid changed to Gas
1997-03-16 Well Log Performed
1997-03-16 Well Mode changed to Abandoned Zone
2000-11-22 Perforation Treatment Performed - Jet Perforation
2000-11-22 Well Fluid changed to Gas
2000-11-22 Well Mode changed to Suspended
2000-11-23 Perforation Treatment Performed - Jet Perforation
2004-05-21 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-17 Perforation 668.50 669.50 7
2000-11-23 Perforation 662.50 663.50 13
2004-05-21 Perforation 644.00 647.00 17
1984-02-17 Acid Treatment 668.50 669.50 0
1984-10-13 Cement Squeeze 668.50 669.50 0
1984-10-13 Perforation 662.50 663.50 7
1984-10-17 Acid Treatment 662.50 663.50 0
1997-03-15 Perforation 658.00 659.50 20
1997-03-16 Packing Device Capped w/Cement 644.00 652.00 0
1997-03-16 Perforation 632.00 634.00 20
2000-11-22 Perforation 658.00 663.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3931 0.0 0.0 0.0
1985 6844 0.0 0.0 0.0
1986 5904 0.0 0.0 0.0
1987 4604 0.0 0.0 0.0
1988 7031 0.0 0.0 0.0
1989 7257 0.0 0.0 0.0
1990 2039 0.0 0.0 0.0
1991 2476 0.0 0.0 0.0
1992 4787 0.0 0.0 0.0
1993 8477 0.0 0.0 0.0
1994 8342 0.0 0.0 0.0
1995 8456 0.0 0.0 0.0
1996 8749 0.0 0.0 0.0
1997 507 0.0 0.0 0.0

For data sources see[5]

References