X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554140613003

Well Details

Well ID: 0554140613003
Loading map...
Location: 00/13-06-055-14W4/3
Location Alias: 00/13-06-55-14 W4M
Location Alias 2: 00/13-06-055-14 W4/03
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 14
Section: 06
County/Municipality: County of Two Hills No. 21
Well Name: OMERS ENERGY HAIRY 13-6-55-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0141733
License Date: 1989-11-15
License Status: Issued
Spud Date: 1989-12-16
Final Drill Date: 1989-12-19
Well Total Depth: 699.00 m
Surface Hole Latitude: 53.726925
Surface Hole Longitude: -112.081736

For data sources see[1][2]

Well History

Date Event
1989-11-15 Obtained License
1989-12-17 Surface Casing Operation Performed
1989-12-19 Blow Occurred
1989-12-19 Finished Drilling
1989-12-19 Well Mode changed to Drilled and Cased
1989-12-20 Well Log Performed
1989-12-21 Production Casing Operation Performed
1989-12-21 Rig Released
1990-01-18 Well Log Performed
1990-01-19 Well Log Performed
1990-01-20 Perforation Treatment Performed - Jet Perforation
1990-01-20 Perforation Treatment Performed - Remedial Casing
1990-01-24 Well Log Performed
1990-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-25 Perforation Treatment Performed - Jet Perforation
1990-01-26 Well Log Performed
1990-01-27 Perforation Treatment Performed - Jet Perforation
1990-07-18 Well Log Performed
1990-07-19 Perforation Treatment Performed - Jet Perforation
1990-07-21 Perforation Treatment Performed - Jet Perforation
1990-07-22 Perforation Treatment Performed - Remedial Casing
2000-11-15 Perforation Treatment Performed - Jet Perforation
2000-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-30 Perforation Treatment Performed - Chemical Squeeze
2004-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-06 Plug Back Performed
2004-03-07 Perforation Treatment Performed - Cement Squeeze
2004-03-07 Plug Back Performed
2004-03-11 Perforation Treatment Performed - Jet Perforation
2004-03-19 Well Began Production
2004-03-19 Well Fluid changed to Gas
2004-03-19 Well Mode changed to Flowing
2016-03-31 Well Fluid changed to Gas
2016-03-31 Well Mode changed to Suspended
2016-11-01 Well Fluid changed to Gas
2016-11-01 Well Mode changed to Flowing
2019-09-30 Well Fluid changed to Gas
2019-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-20 Perforation 305.00 305.50 7
2000-11-15 Perforation 555.00 557.00 13
2000-11-15 Perforation 551.50 552.50 13
2000-11-20 Acid Treatment 664.00 667.00 0
2000-11-30 Chemical Squeeze 551.50 557.00 0
2004-03-06 Packing Device Capped w/Cement 651.00 659.00 0
2004-03-07 Cement Squeeze 551.50 557.00 0
2004-03-11 Perforation 637.80 640.00 17
1990-01-20 Remedial Casing Cementing 305.00 305.50 0
1990-01-25 Perforation 664.00 666.00 7
1990-01-25 Acid Treatment 664.00 666.00 0
1990-01-27 Perforation 551.50 552.50 7
1990-07-19 Perforation 385.00 386.00 13
1990-07-21 Perforation 305.00 305.50 7
1990-07-22 Remedial Casing Cementing 305.00 386.00 0
2000-11-15 Perforation 664.00 667.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 6803 0.0 0.0 0.0
2005 8752 0.0 0.0 0.0
2006 8731 0.0 0.0 0.0
2007 8706 0.0 0.0 0.0
2008 8782 0.0 0.0 0.0
2009 8625 0.0 0.0 0.0
2010 8644 0.0 0.0 0.0
2011 8592 0.0 0.0 0.0
2012 8699 0.0 0.0 0.0
2013 8757 0.0 0.0 0.0
2014 8493 0.0 0.0 0.0
2015 8689 0.0 0.0 0.0
2016 1073 0.0 0.0 0.0
2017 5776 0.0 0.0 0.0
2018 1807 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-12-19 Blow 668.00 699.00

For data sources see[6]

References