0554131812003

Well Details

Well ID: 0554131812003
Loading map...
Location: 00/12-18-055-13W4/3
Location Alias: 00/12-18-55-13 W4M
Location Alias 2: 00/12-18-055-13 W4/03
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 13
Section: 18
County/Municipality: County of Two Hills No. 21
Well Name: LONG RUN HAIRY 12-18-55-13
Operator Name: Long Run Exploration Ltd.
License Number: 0353963
License Date: 2006-03-14
License Status: Abandoned
Spud Date: 2006-07-07
Final Drill Date: 2006-07-10
Well Total Depth: 744.00 m
Surface Hole Latitude: 53.752329
Surface Hole Longitude: -111.936700

For data sources see[1][2]

Well History

Date Event
2006-03-14 Obtained License
2006-07-08 Surface Casing Operation Performed
2006-07-09 Direction Drilling Operation Performed - Deviate
2006-07-10 Finished Drilling
2006-07-10 Production Casing Operation Performed
2006-07-10 Rig Released
2006-07-10 Well Log Performed
2006-07-10 Well Mode changed to Drilled and Cased
2006-08-03 Perforation Treatment Performed - Jet Perforation
2007-07-23 Perforation Treatment Performed - Jet Perforation
2010-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-06 Perforation Treatment Performed - Cement Squeeze
2010-10-06 Plug Back Performed
2010-10-06 Well Mode changed to Abandoned Zone
2010-10-08 Perforation Treatment Performed - Jet Perforation
2010-10-09 Perforation Treatment Performed - Remedial Casing
2010-12-28 Perforation Treatment Performed - Jet Perforation
2010-12-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-29 Perforation Treatment Performed - Remedial Casing
2010-12-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-30 Perforation Treatment Performed - Remedial Casing
2011-06-29 Perforation Treatment Performed - Jet Perforation
2011-07-01 Perforation Treatment Performed - Jet Perforation
2011-07-01 Well Log Performed
2011-07-02 Well Log Performed
2011-07-03 Perforation Treatment Performed - Jet Perforation
2011-07-04 Well Log Performed
2011-07-05 Perforation Treatment Performed - Jet Perforation
2011-07-06 Well Log Performed
2011-07-08 Perforation Treatment Performed - Jet Perforation
2011-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-09 Plug Back Performed
2011-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-10 Plug Back Performed
2011-08-16 Perforation Treatment Performed - Cement Plug
2012-12-22 Perforation Treatment Performed - Cement Squeeze
2012-12-22 Perforation Treatment Performed - Jet Perforation
2012-12-22 Plug Back Performed
2013-08-02 Perforation Treatment Performed - Jet Perforation
2013-08-02 Well Log Performed
2013-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-08 Perforation Treatment Performed - Jet Perforation
2013-08-08 Well Log Performed
2013-08-09 Perforation Treatment Performed - Cement Squeeze
2013-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-12 Perforation Treatment Performed - Jet Perforation
2013-08-13 Perforation Treatment Performed - Cement Squeeze
2013-08-13 Well Log Performed
2013-08-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-07-09 204.70 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-03 Perforation 550.50 554.00 17
2010-10-08 Perforation 190.50 192.50 20
2010-10-08 Perforation 190.70 192.70 20
2010-10-09 Remedial Casing Cementing 190.50 192.70 0
2010-12-28 Perforation 309.00 311.00 20
2010-12-28 Perforation 426.50 428.50 20
2010-12-29 Remedial Casing Cementing 426.50 428.50 0
2010-12-29 Packing Device Capped w/Cement 404.00 424.50 0
2010-12-30 Remedial Casing Cementing 309.00 311.00 0
2010-12-30 Packing Device Capped w/Cement 298.00 307.00 0
2011-06-29 Perforation 309.00 311.00 17
2007-07-23 Perforation 715.00 716.00 17
2011-07-01 Perforation 426.50 428.50 17
2011-07-03 Perforation 492.50 494.00 17
2011-07-05 Perforation 550.50 554.00 17
2011-07-05 Perforation 715.00 716.00 17
2011-07-08 Perforation 714.00 716.00 17
2011-07-08 Perforation 714.30 715.40 99
2011-08-09 Packing Device Capped w/Cement 528.60 536.60 0
2011-08-10 Packing Device Capped w/Cement 471.80 479.80 0
2011-08-10 Packing Device Capped w/Cement 410.80 418.80 0
2011-08-10 Packing Device Capped w/Cement 291.80 299.80 0
2007-07-23 Perforation 492.50 494.00 17
2011-08-16 Cement Plug 187.00 212.00 0
2012-12-22 Perforation 183.50 184.50 17
2012-12-22 Perforation 181.00 182.00 17
2012-12-22 Cement Squeeze 183.50 184.50 0
2012-12-22 Cement Squeeze 181.00 182.00 0
2013-08-02 Perforation 180.00 182.00 17
2013-08-03 Acid Treatment 180.00 182.00 0
2013-08-08 Perforation 173.00 174.00 17
2013-08-08 Acid Treatment 173.00 174.00 0
2013-08-09 Cement Squeeze 173.00 174.00 0
2010-10-06 Packing Device Capped w/Cement 700.00 708.00 0
2013-08-12 Perforation 115.00 116.00 17
2013-08-12 Acid Treatment 115.00 116.00 0
2013-08-13 Cement Squeeze 115.00 116.00 0
2010-10-06 Acid Treatment 492.50 494.00 0
2010-10-06 Cement Squeeze 492.50 494.00 0
2010-10-06 Packing Device Capped w/Cement 479.50 487.50 0
2010-10-06 Cement Squeeze 550.50 554.00 0
2010-10-06 Packing Device Capped w/Cement 537.50 545.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-08-16 No Incident Encountered 0.00 0.00
2012-12-22 No Incident Encountered 0.00 0.00
2013-08-19 No Incident Encountered 0.00 0.00

For data sources see[6]