If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0554120902002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.732678,"lon":-111.719601,"icon":""}]} |
Location: 00/02-09-055-12W4/2 | |
Location Alias: 00/02-09-55-12 W4M | |
Location Alias 2: 00/02-09-055-12 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 4 | |
Range: 12 | |
Section: 09 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: AMOCO DUVERNAY 2-9-55-12 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0085752 | |
License Date: 1980-09-19 | |
License Status: RecCertified | |
Spud Date: 1980-11-01 | |
Final Drill Date: 1980-11-05 | |
Well Total Depth: 760.00 m | |
Surface Hole Latitude: 53.732678 | |
Surface Hole Longitude: -111.719601 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-09-19 | Obtained License |
1980-11-03 | Drill Stem Test Performed |
1980-11-05 | Drill Stem Test Performed |
1980-11-05 | Finished Drilling |
1980-11-06 | Production Casing Operation Performed |
1980-11-21 | Perforation Treatment Performed - Jet Perforation |
1980-11-26 | Perforation Treatment Performed - Cement Squeeze |
1980-11-26 | Perforation Treatment Performed - Jet Perforation |
1980-11-26 | Well Mode changed to Drilled and Cased |
1990-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-06-22 | Plug Back Performed |
1990-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-06-25 | Plug Back Performed |
1990-06-25 | Well Abandoned |
1990-06-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-21 | Perforation | 557.50 | 560.00 | 13 |
1980-11-21 | Perforation | 660.00 | 663.00 | 13 |
1980-11-26 | Cement Squeeze | 557.50 | 663.00 | 0 |
1980-11-26 | Perforation | 657.00 | 658.50 | 13 |
1980-11-26 | Perforation | 554.30 | 555.50 | 13 |
1980-11-26 | Perforation | 556.00 | 556.60 | 13 |
1990-06-22 | Packing Device Capped w/Cement | 639.00 | 649.00 | 0 |
1990-06-25 | Packing Device Capped w/Cement | 537.00 | 547.00 | 0 |
For data sources see[4]