X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554120610000

Well Details

Well ID: 0554120610000
Loading map...
Location: 00/10-06-055-12W4/0
Location Alias: 00/10-06-55-12 W4M
Location Alias 2: 00/10-06-055-12 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 12
Section: 06
County/Municipality: County of Two Hills No. 21
Well Name: BRASCAN ET AL HAIRY 10-6-55-12
Operator Name: Nyrstar Myra Falls Ltd.
License Number: 0058793
License Date: 1976-06-21
License Status: RecCertified
Spud Date: 1976-06-22
Final Drill Date: 1976-06-25
Well Total Depth: 612.60 m
Surface Hole Latitude: 53.722674
Surface Hole Longitude: -111.768645

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-21 Obtained License
1976-06-25 Finished Drilling
1976-06-25 Production Casing Operation Performed
1976-07-24 Well Mode changed to Drilled and Cased
1976-07-26 Perforation Treatment Performed - Jet Perforation
1976-12-07 Well Began Production
1976-12-07 Well Fluid changed to Gas
1976-12-07 Well Mode changed to Flowing
1978-06-22 Perforation Treatment Performed - Jet Perforation
1978-06-22 Well Fluid changed to Gas
1978-06-22 Well Mode changed to Flowing
1978-06-23 Perforation Treatment Performed - Jet Perforation
1979-04-01 Well Fluid changed to Gas
1979-04-01 Well Mode changed to Suspended
1988-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-22 Plug Back Performed
1988-05-22 Well Abandoned
1988-05-22 Well Fluid changed to Gas
1988-05-22 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-07-26 Perforation 540.10 541.30 7
1976-07-26 Perforation 542.80 544.10 7
1978-06-22 Perforation 546.80 546.80 16
1978-06-23 Perforation 505.40 507.20 7
1978-06-23 Perforation 508.40 510.50 7
1988-05-22 Packing Device Capped w/Cement 498.00 508.00 0
1988-05-22 Packing Device Capped w/Cement 488.00 498.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 500 0.0 0.0 0.0
1977 6430 0.0 0.0 0.0
1978 359 0.0 0.0 0.0

For data sources see[5]

References