X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554100905000

Well Details

Well ID: 0554100905000
Loading map...
Location: 00/05-09-055-10W4/0
Location Alias: 00/05-09-55-10 W4M
Location Alias 2: 00/05-09-055-10 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 10
Section: 09
County/Municipality: County of Two Hills No. 21
Well Name: CNRL ET AL DUVERNAY 5-9-55-10
Operator Name: Canadian Natural Resources Limited
License Number: 0090583
License Date: 1981-06-08
License Status: Abandoned
Spud Date: 1981-06-14
Final Drill Date: 1981-06-17
Well Total Depth: 760.00 m
Surface Hole Latitude: 53.734219
Surface Hole Longitude: -111.435518

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-08 Obtained License
1981-06-16 Drill Stem Test Performed
1981-06-17 Finished Drilling
1981-06-18 Well Log Performed
1981-06-19 Production Casing Operation Performed
1981-06-19 Well Mode changed to Drilled and Cased
1981-07-10 Perforation Treatment Performed - Jet Perforation
1983-06-15 Well Began Production
1983-06-15 Well Fluid changed to Gas
1983-06-15 Well Mode changed to Flowing
1992-05-01 Well Fluid changed to Gas
1992-05-01 Well Mode changed to Suspended
1995-05-17 Well Fluid changed to Gas
1995-05-17 Well Mode changed to Flowing
2006-01-10 Perforation Treatment Performed - Jet Perforation
2006-01-10 Well Log Performed
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Suspended
2009-05-14 Well Fluid changed to Gas
2009-05-14 Well Mode changed to Flowing
2011-06-24 Perforation Treatment Performed - Cement Plug
2011-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-25 Plug Back Performed
2011-06-25 Well Fluid changed to Gas
2011-06-25 Well Mode changed to Abandoned Zone
2011-06-26 Perforation Treatment Performed - Jet Perforation
2011-06-26 Well Log Performed
2011-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-27 Perforation Treatment Performed - Remedial Casing
2011-08-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-10 Perforation 569.00 571.50 6
1981-07-10 Perforation 573.00 574.00 6
2006-01-10 Perforation 531.50 533.00 17
2011-06-24 Cement Plug 574.00 748.00 0
2011-06-25 Packing Device Capped w/Cement 551.00 559.00 0
2011-06-25 Packing Device Capped w/Cement 517.00 525.00 0
2011-06-26 Perforation 234.00 235.00 13
2011-06-27 Remedial Casing Cementing 234.00 235.00 0
2011-06-27 Packing Device Capped w/Cement 135.00 237.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3572 0.0 0.0 0.0
1984 4287 0.0 0.0 0.0
1985 6364 0.0 0.0 0.0
1986 2476 0.0 0.0 0.0
1987 2379 0.0 0.0 0.0
1988 1916 0.0 0.0 0.0
1989 2943 0.0 0.0 0.0
1990 3312 0.0 0.0 0.0
1991 3175 0.0 0.0 0.0
1992 1908 0.0 0.0 0.0
1995 1842 0.0 0.0 0.0
2000 580 0.0 0.0 0.0
2006 4589 0.0 0.0 0.0
2008 3877 0.0 0.0 0.0
2009 804 0.0 0.0 0.0

For data sources see[5]

References