X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554062011020

Well Details

Well ID: 0554062011020
Loading map...
Location: 02/11-20-055-06W4/0
Location Alias: 02/11-20-55-06 W4M
Location Alias 2: 02/11-20-055-06 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 20
County/Municipality: County of Two Hills No. 21
Well Name: AMOCO 01 LINDBERGH 11-20-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0106776
License Date: 1984-04-19
License Status: Suspension
Spud Date: 1984-09-22
Final Drill Date: 1984-09-26
Well Total Depth: 783.00 m
Surface Hole Latitude: 53.765512
Surface Hole Longitude: -110.854930

For data sources see[1][2]

Well History

Date Event
1984-04-19 Obtained License
1984-09-22 Direction Drilling Operation Performed - Deviate
1984-09-22 Surface Casing Operation Performed
1984-09-26 Finished Drilling
1984-09-26 Well Mode changed to Drilled and Cased
1984-09-27 Well Log Performed
1984-09-28 Production Casing Operation Performed
1984-09-28 Rig Released
1984-10-01 Well Log Performed
1984-11-20 Well Log Performed
1984-11-22 Perforation Treatment Performed - Jet Perforation
1984-11-22 Well Log Performed
1984-11-24 Well Began Production
1984-11-24 Well Fluid changed to Crude Bitumen
1984-11-24 Well Mode changed to Pumping
1985-04-27 Well Log Performed
1985-10-16 Perforation Treatment Performed - Cement Squeeze
1985-10-25 Perforation Treatment Performed - Jet Perforation
1985-10-25 Well Log Performed
1987-03-31 Well Fluid changed to Crude Bitumen
1987-03-31 Well Mode changed to Suspended
1993-03-01 Well Fluid changed to Crude Bitumen
1993-03-01 Well Log Performed
1993-03-01 Well Mode changed to Pumping
1995-04-01 Well Fluid changed to Crude Bitumen
1995-04-01 Well Mode changed to Suspended
2005-04-01 Well Fluid changed to Crude Bitumen
2005-04-01 Well Mode changed to Pumping
2005-04-29 Perforation Treatment Performed - Jet Perforation
2005-04-29 Well Log Performed
2007-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-05-23 Plug Back Performed
2007-05-23 Well Fluid changed to Crude Bitumen
2007-05-23 Well Mode changed to Abandoned Zone
2007-05-24 Perforation Treatment Performed - Jet Perforation
2007-10-20 Perforation Treatment Performed - Cement Plug
2007-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-21 Plug Back Performed
2007-10-22 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-09-22 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-22 Perforation 737.50 739.50 13
2007-05-24 Perforation 631.50 635.00 26
2007-10-20 Cement Plug 641.00 710.00 0
2007-10-21 Packing Device Capped w/Cement 614.00 627.00 0
2007-10-22 Perforation 594.50 596.50 26
2007-10-22 Perforation 600.00 601.50 26
1985-10-16 Cement Squeeze 737.50 739.50 0
1985-10-25 Perforation 729.30 733.00 13
2005-04-29 Perforation 729.30 733.00 13
2005-04-29 Perforation 740.50 742.50 26
2005-04-29 Perforation 744.00 746.00 26
2005-04-29 Perforation 748.00 749.00 26
2005-04-29 Perforation 752.50 754.00 26
2007-05-23 Packing Device Capped w/Cement 710.00 719.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 96 0.0 0.0 0.0
1985 1339 0.0 0.0 0.0
1986 456 0.0 0.0 0.0
1987 479 0.0 0.0 0.0
1993 6996 0.0 0.0 0.0
1994 3312 0.0 0.0 0.0
2005 2804 0.0 0.0 0.0
2006 6544 0.0 0.0 0.0
2007 142 0.0 0.0 0.0

For data sources see[6]

References