X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554061916002

Well Details

Well ID: 0554061916002
Loading map...
Location: 00/16-19-055-06W4/2
Location Alias: 00/16-19-55-06 W4M
Location Alias 2: 00/16-19-055-06 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 19
County/Municipality: County of Two Hills No. 21
Well Name: PVR 100 LINDBERGH 16-19-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0200391
License Date: 1997-04-17
License Status: Suspension
Spud Date: 1997-04-18
Final Drill Date: 1997-05-12
Well Total Depth: 656.00 m
Surface Hole Latitude: 53.769317
Surface Hole Longitude: -110.875323

For data sources see[1][2]

Well History

Date Event
1997-04-17 Obtained License
1997-04-18 Direction Drilling Operation Performed - Deviate
1997-04-18 Surface Casing Operation Performed
1997-05-12 Finished Drilling
1997-05-12 Well Mode changed to Drilled and Cased
1997-05-13 Production Casing Operation Performed
1997-05-13 Rig Released
1997-05-26 Well Log Performed
1997-06-06 Well Log Performed
1997-06-11 Well Log Performed
1997-06-17 Perforation Treatment Performed - Jet Perforation
1997-06-18 Well Log Performed
2003-02-16 Perforation Treatment Performed - Chemical Squeeze
2009-03-01 Well Began Production
2009-03-01 Well Fluid changed to Crude Bitumen
2009-03-01 Well Mode changed to Pumping
2009-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-25 Plug Back Performed
2009-03-26 Perforation Treatment Performed - Jet Perforation
2009-09-30 Well Fluid changed to Crude Bitumen
2009-09-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-04-18 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-17 Perforation 634.50 639.00 26
2003-02-16 Chemical Squeeze 634.50 639.00 0
2009-03-25 Packing Device Capped w/Cement 614.00 630.00 0
2009-03-26 Perforation 498.00 500.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 48 0.0 0.0 0.0

For data sources see[6]

References