X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554061502050

Well Details

Well ID: 0554061502050
Loading map...
Location: 05/02-15-055-06W4/0
Location Alias: 05/02-15-55-06 W4M
Location Alias 2: 05/02-15-055-06 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 15
County/Municipality: County of Two Hills No. 21
Well Name: NORWEST OBS LIND EX 2D-15-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0142051
License Date: 1989-12-08
License Status: Abandoned
Spud Date: 1989-12-18
Final Drill Date: 1990-01-01
Well Total Depth: 649.00 m
Surface Hole Latitude: 53.748098
Surface Hole Longitude: -110.804294

For data sources see[1][2]

Well History

Date Event
1989-12-08 Obtained License
1989-12-18 Surface Casing Operation Performed
1989-12-28 Direction Drilling Operation Performed - Deviate
1990-01-01 Finished Drilling
1990-01-01 Production Casing Operation Performed
1990-01-01 Well Log Performed
1990-01-01 Well Mode changed to Drilled and Cased
1990-01-02 Rig Released
1990-01-02 Well Log Performed
1990-01-11 Well Log Performed
1990-01-18 Well Log Performed
1990-01-19 Well Log Performed
1990-01-20 Perforation Treatment Performed - Open-Hole Completion
1990-02-01 Well Type changed to Observation
1990-09-17 Well Began Production
1990-09-17 Well Fluid changed to Crude Bitumen
1990-09-17 Well Mode changed to Pumping
1995-12-31 Well Fluid changed to Crude Bitumen
1995-12-31 Well Mode changed to Suspended
2000-04-12 Well Fluid changed to Crude Bitumen
2000-04-12 Well Mode changed to Pumping
2001-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-06 Plug Back Performed
2001-09-06 Well Fluid changed to Crude Bitumen
2001-09-06 Well Log Performed
2001-09-06 Well Mode changed to Abandoned Zone
2001-09-07 Perforation Treatment Performed - Jet Perforation
2011-02-18 Perforation Treatment Performed - Cement Plug
2011-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-22 Plug Back Performed
2011-03-16 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-12-28 106.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-20 Open Hole/Barefoot Completion 642.50 649.00 0
2001-09-06 Packing Device Capped w/Cement 624.00 633.00 0
2001-09-07 Perforation 525.50 527.00 26
2011-02-18 Cement Plug 528.10 625.90 0
2011-02-22 Packing Device Capped w/Cement 477.00 515.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 7149 0.0 0.0 0.0
1991 7027 0.0 0.0 0.0
1992 6706 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 4517 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
2000 4623 0.0 0.0 0.0
2001 0 0.0 0.0 0.0

For data sources see[6]

References