X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554061502022

Well Details

Well ID: 0554061502022
Loading map...
Location: 02/02-15-055-06W4/2
Location Alias: 02/02-15-55-06 W4M
Location Alias 2: 02/02-15-055-06 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 15
County/Municipality: County of Two Hills No. 21
Well Name: NORWEST LINDBERGH 2B-15-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0120241
License Date: 1985-12-11
License Status: Abandoned
Spud Date: 1985-12-16
Final Drill Date: 1985-12-19
Well Total Depth: 813.00 m
Surface Hole Latitude: 53.748091
Surface Hole Longitude: -110.804576

For data sources see[1][2]

Well History

Date Event
1985-12-11 Obtained License
1985-12-16 Direction Drilling Operation Performed - Deviate
1985-12-17 Surface Casing Operation Performed
1985-12-19 Finished Drilling
1985-12-19 Well Log Performed
1985-12-19 Well Mode changed to Drilled and Cased
1985-12-20 Production Casing Operation Performed
1985-12-20 Rig Released
1985-12-23 Well Log Performed
1986-01-21 Well Log Performed
1986-02-28 Perforation Treatment Performed - Jet Perforation
1986-02-28 Well Log Performed
2000-06-02 Perforation Treatment Performed - Jet Perforation
2000-06-02 Well Log Performed
2001-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-14 Perforation Treatment Performed - Cement Plug
2001-09-14 Plug Back Performed
2001-09-17 Perforation Treatment Performed - Jet Perforation
2001-09-17 Well Log Performed
2001-09-17 Well Mode changed to Drilled and Cased
2001-09-18 Well Began Production
2001-09-18 Well Fluid changed to Crude Bitumen
2001-09-18 Well Mode changed to Pumping
2003-07-31 Well Fluid changed to Crude Bitumen
2003-07-31 Well Mode changed to Suspended
2011-02-05 Perforation Treatment Performed - Cement Plug
2011-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-06 Plug Back Performed
2011-02-06 Well Fluid changed to Crude Bitumen
2011-02-06 Well Mode changed to Abandoned Zone
2011-03-15 Well Abandoned
2011-03-15 Well Fluid changed to Crude Bitumen
2011-03-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-12-16 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-28 Perforation 773.00 778.00 39
2000-06-02 Perforation 764.00 766.00 26
2001-09-14 Cement Plug 772.00 808.00 0
2001-09-14 Packing Device Capped w/Cement 744.00 753.00 0
2001-09-17 Perforation 603.50 604.50 26
2011-02-05 Cement Plug 604.50 738.60 0
2011-02-06 Packing Device Capped w/Cement 557.60 596.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 430 0.0 0.0 0.0

For data sources see[6]

References