X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554060910000

Well Details

Well ID: 0554060910000
Loading map...
Location: 00/10-09-055-06W4/0
Location Alias: 00/10-09-55-06 W4M
Location Alias 2: 00/10-09-055-06 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 09
County/Municipality: County of Two Hills No. 21
Well Name: PVR LINDBERGH 10A-9-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0090574
License Date: 1981-06-08
License Status: Suspension
Spud Date: 1981-06-25
Final Drill Date: 1981-06-30
Well Total Depth: 660.00 m
Surface Hole Latitude: 53.738057
Surface Hole Longitude: -110.829648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-08 Obtained License
1981-06-30 Drill Stem Test Performed
1981-06-30 Finished Drilling
1981-06-30 Well Mode changed to Drilled and Cased
1981-07-01 Drill Stem Test Performed
1981-07-02 Production Casing Operation Performed
1983-03-01 Well Began Production
1983-03-01 Well Fluid changed to Crude Bitumen
1983-03-01 Well Mode changed to Flowing
1983-03-06 Perforation Treatment Performed - Jet Perforation
1983-03-09 Perforation Treatment Performed - Jet Perforation
1983-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-10 Perforation Treatment Performed - Cement Squeeze
1983-03-13 Perforation Treatment Performed - Jet Perforation
1983-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-09-26 Well Log Performed
1983-09-27 Perforation Treatment Performed - Jet Perforation
1983-09-27 Well Fluid changed to Crude Bitumen
1983-09-27 Well Mode changed to Abandoned Zone
2005-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-04-05 Perforation Treatment Performed - Chemical Squeeze
2007-10-09 Well Log Performed
2007-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-08 Plug Back Performed
2011-06-07 Well Log Performed
2011-06-15 Perforation Treatment Performed - Cement Plug
2011-06-15 Perforation Treatment Performed - Jet Perforation
2011-06-15 Well Log Performed
2011-06-16 Perforation Treatment Performed - Remedial Casing
2012-05-16 Well Log Performed
2012-05-23 Perforation Treatment Performed - Jet Perforation
2012-05-23 Well Log Performed
2012-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-24 Perforation Treatment Performed - Remedial Casing
2012-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-25 Perforation Treatment Performed - Jet Perforation
2012-05-25 Well Log Performed
2012-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-27 Perforation Treatment Performed - Remedial Casing
2013-07-31 Well Log Performed
2013-08-06 Perforation Treatment Performed - Cement Plug
2013-08-06 Perforation Treatment Performed - Jet Perforation
2013-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-07 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-06 Perforation 602.00 603.50 13
2005-04-24 Acid Treatment 553.00 568.00 0
2006-04-05 Chemical Squeeze 553.00 568.00 0
2007-11-08 Packing Device Capped w/Cement 535.00 550.00 0
2011-06-15 Cement Plug 430.00 527.00 0
2011-06-15 Perforation 204.00 207.00 17
2011-06-16 Remedial Casing Cementing 204.00 207.00 0
2012-05-23 Perforation 342.00 345.00 17
2012-05-24 Remedial Casing Cementing 342.00 345.00 0
2012-05-24 Packing Device Capped w/Cement 311.50 336.00 0
2012-05-25 Packing Device Capped w/Cement 183.00 196.00 0
1983-03-09 Perforation 606.00 607.00 4
2012-05-25 Perforation 137.00 140.00 17
2012-05-27 Remedial Casing Cementing 137.00 140.00 0
2012-05-27 Packing Device Capped w/Cement 113.00 130.00 0
2013-08-06 Cement Plug 324.00 332.00 0
2013-08-06 Perforation 292.00 294.00 17
2013-08-07 Remedial Casing Cementing 292.00 294.00 0
2013-08-07 Packing Device Capped w/Cement 269.60 286.00 0
1983-03-10 Acid Treatment 602.00 607.00 0
1983-03-10 Cement Squeeze 602.00 607.00 0
1983-03-13 Perforation 602.00 603.50 13
1983-03-13 Perforation 606.00 607.00 13
1983-09-26 Packing Device Capped w/Cement 591.00 599.00 0
1983-09-26 Packing Device Capped w/Cement 569.50 571.50 0
1983-09-27 Perforation 553.00 568.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-27 No Incident Encountered 0.00 0.00
2013-08-08 No Incident Encountered 0.00 0.00

For data sources see[5]

References