If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545191210003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.652596,"lon":-116.662858,"icon":""}]} |
Location: 00/10-12-054-19W5/3 | |
Location Alias: 00/10-12-54-19 W5M | |
Location Alias 2: 00/10-12-054-19 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 19 | |
Section: 12 | |
County/Municipality: Yellowhead County | |
Well Name: SALVO ENERGY EDSON 10-12-54-19 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0085819 | |
License Date: 1980-09-23 | |
License Status: Suspension | |
Spud Date: 1980-10-02 | |
Final Drill Date: 1980-10-26 | |
Well Total Depth: 2601.00 m | |
Surface Hole Latitude: 53.652596 | |
Surface Hole Longitude: -116.662858 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-09-23 | Obtained License |
1980-10-26 | Finished Drilling |
1980-10-26 | Well Log Performed |
1980-10-30 | Production Casing Operation Performed |
1980-11-12 | Perforation Treatment Performed - Jet Perforation |
1980-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-17 | Perforation Treatment Performed - Fractured |
1981-02-17 | Perforation Treatment Performed - Jet Perforation |
1981-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-02-20 | Perforation Treatment Performed - Fractured |
1982-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-06-19 | Perforation Treatment Performed - Jet Perforation |
1982-06-23 | Perforation Treatment Performed - Jet Perforation |
1982-06-23 | Perforation Treatment Performed - Remedial Casing |
1982-06-28 | Perforation Treatment Performed - Cement Squeeze |
1982-06-28 | Perforation Treatment Performed - Jet Perforation |
1982-06-28 | Perforation Treatment Performed - Remedial Casing |
1982-07-01 | Perforation Treatment Performed - Jet Perforation |
1984-02-02 | Well Mode changed to Drilled and Cased |
1990-10-14 | Perforation Treatment Performed - Cement Squeeze |
1990-10-14 | Plug Back Performed |
1990-10-14 | Well Mode changed to Abandoned Zone |
1990-10-20 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-12 | Perforation | 2565.00 | 2570.00 | 7 |
1982-06-19 | Perforation | 1310.50 | 1311.30 | 7 |
1982-06-19 | Perforation | 1312.00 | 1313.30 | 7 |
1982-06-23 | Perforation | 1360.00 | 1360.30 | 14 |
1982-06-23 | Remedial Casing Cementing | 1360.00 | 1360.30 | 0 |
1982-06-28 | Perforation | 1278.00 | 1278.30 | 7 |
1982-06-28 | Remedial Casing Cementing | 1278.00 | 1278.30 | 0 |
1982-06-28 | Cement Squeeze | 1310.50 | 1326.00 | 0 |
1982-07-01 | Perforation | 1321.00 | 1326.00 | 7 |
1990-10-14 | Cement Squeeze | 1321.00 | 1326.00 | 0 |
1990-10-20 | Perforation | 1924.00 | 1926.50 | 7 |
1980-11-15 | Acid Treatment | 2565.00 | 2570.00 | 0 |
1990-10-20 | Perforation | 2565.00 | 2570.00 | 7 |
1980-11-17 | Fracture | 2565.00 | 2570.00 | 0 |
1981-02-17 | Perforation | 1924.00 | 1926.50 | 7 |
1981-02-18 | Acid Treatment | 1924.00 | 1926.50 | 0 |
1981-02-20 | Fracture | 1924.00 | 1926.50 | 0 |
1982-06-18 | Packing Device Capped w/Cement | 2504.00 | 2514.00 | 0 |
1982-06-18 | Packing Device Capped w/Cement | 1910.00 | 1920.00 | 0 |
1982-06-19 | Perforation | 1321.00 | 1326.00 | 7 |
For data sources see[4]