X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545182216000

Well Details

Well ID: 0545182216000
Loading map...
Location: 00/16-22-054-18W5/0
Location Alias: 00/16-22-54-18 W5M
Location Alias 2: 00/16-22-054-18 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 18
Section: 22
County/Municipality: Yellowhead County
Well Name: CALPINE EDSON 16-22-54-18
Operator Name: Calpine Canada Resources Company
License Number: 0096712
License Date: 1982-07-19
License Status: Re-Entered
Spud Date: 1982-07-31
Final Drill Date: 1982-09-04
Well Total Depth: 2660.00 m
Surface Hole Latitude: 53.683429
Surface Hole Longitude: -116.562088

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-19 Obtained License
1982-07-31 Lost Circulation Occurred
1982-09-04 Finished Drilling
1982-09-04 Well Log Performed
1982-09-04 Well Mode changed to Drilled and Cased
1982-09-11 Production Casing Operation Performed
1982-11-06 Perforation Treatment Performed - Jet Perforation
1982-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-10 Perforation Treatment Performed - Jet Perforation
1982-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-15 Perforation Treatment Performed - Jet Perforation
1982-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-19 Perforation Treatment Performed - Jet Perforation
1982-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-18 Perforation Treatment Performed - Jet Perforation
1983-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-20 Perforation Treatment Performed - Cement Squeeze
1983-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-24 Perforation Treatment Performed - Cement Squeeze
1983-03-27 Perforation Treatment Performed - Jet Perforation
1983-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-31 Perforation Treatment Performed - Fractured
1983-04-05 Well Began Production
1983-04-05 Well Fluid changed to Gas
1983-04-05 Well Mode changed to Flowing
1994-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-30 Perforation Treatment Performed - Jet Perforation
1994-06-30 Plug Back Performed
1994-07-01 Perforation Treatment Performed - Remedial Casing
1994-07-01 Well Fluid changed to Gas
1994-07-01 Well Mode changed to Abandoned and Re-entered
1994-07-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-06 Perforation 2637.00 2642.00 13
1982-11-21 Acid Treatment 2461.50 2464.50 0
1982-11-26 Packing Device Capped w/Cement 2450.00 2458.00 0
1983-03-18 Perforation 1884.50 1885.00 12
1983-03-18 Perforation 1824.00 1824.50 12
1983-03-19 Acid Treatment 1884.50 1885.00 0
1983-03-20 Cement Squeeze 1884.50 1885.00 0
1983-03-20 Acid Treatment 1824.00 1824.50 0
1983-03-23 Acid Treatment 1824.00 1824.50 0
1983-03-24 Cement Squeeze 1824.00 1824.50 0
1983-03-27 Perforation 1867.00 1869.00 10
1982-11-10 Packing Device Capped w/Cement 2614.00 2622.00 0
1983-03-28 Acid Treatment 1867.00 1869.00 0
1983-03-31 Fracture 1867.00 1869.00 0
1994-06-30 Packing Device Capped w/Cement 1847.00 1855.00 0
1994-06-30 Perforation 511.00 512.00 13
1994-07-01 Remedial Casing Cementing 511.00 512.00 0
1982-11-10 Perforation 2557.00 2564.00 13
1982-11-13 Acid Treatment 2557.00 2564.00 0
1982-11-15 Packing Device Capped w/Cement 2542.00 2550.00 0
1982-11-15 Perforation 2516.50 2521.00 13
1982-11-17 Acid Treatment 2516.50 2521.00 0
1982-11-19 Packing Device Capped w/Cement 2502.00 2510.00 0
1982-11-19 Perforation 2461.50 2464.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3376 0.0 0.0 0.0
1984 5788 0.0 0.0 0.0
1985 5918 0.0 0.0 0.0
1986 5296 0.0 0.0 0.0
1987 4924 0.0 0.0 0.0
1988 4464 0.0 0.0 0.0
1989 4632 0.0 0.0 0.0
1990 3432 0.0 0.0 0.0
1991 4655 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-07-31 Lost Circulation 145.00 145.00

For data sources see[6]

References