X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545181210000

Well Details

Well ID: 0545181210000
Loading map...
Location: 00/10-12-054-18W5/0
Location Alias: 00/10-12-54-18 W5M
Location Alias 2: 00/10-12-054-18 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 18
Section: 12
County/Municipality: Yellowhead County
Well Name: TEXACO MARIBORO 10-12-54-18
Operator Name: Imperial Oil Resources Limited
License Number: 0036741
License Date: 1969-08-26
License Status: RecCertified
Spud Date: 1969-09-03
Final Drill Date: 1969-11-15
Well Total Depth: 3736.50 m
Surface Hole Latitude: 53.652765
Surface Hole Longitude: -116.515351

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-08-26 Obtained License
1969-09-18 Drill Stem Test Performed
1969-10-06 Drill Stem Test Performed
1969-10-07 Drill Stem Test Performed
1969-10-08 Drill Stem Test Performed
1969-10-09 Drill Stem Test Performed
1969-10-10 Drill Stem Test Performed
1969-11-10 Drill Stem Test Performed
1969-11-15 Finished Drilling
1969-11-15 Well Mode changed to Drilled and Cased
1969-11-22 Perforation Treatment Performed - Open-Hole Completion
1969-11-22 Production Casing Operation Performed
1969-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-06 Well Began Production
1969-12-06 Well Fluid changed to Crude Oil
1969-12-06 Well Mode changed to Flowing
1969-12-16 Perforation Treatment Performed - Abrasa-Jet Perforation
1970-03-01 Well Fluid changed to Crude Oil
1970-03-01 Well Mode changed to Suspended
1970-09-23 Well Abandoned
1970-09-23 Well Fluid changed to Crude Oil
1970-09-23 Well Mode changed to Abandoned
1970-10-23 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-11-22 Open Hole/Barefoot Completion 1932.10 2209.80 0
1969-11-28 Acid Treatment 1932.10 2209.80 0
1969-12-05 Acid Treatment 1932.10 2209.80 0
1969-12-16 Hydra Jet Perforation 1847.10 1847.10 0
1970-10-23 Cement Plug 1668.80 1783.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 112 0.0 0.0 0.0
1970 0 0.0 0.0 0.0

For data sources see[5]

References